Lagos to flag off construction of 4th Mainland bridge in 1st quarter of 2024 - Newstrends
Connect with us

News

Lagos to flag off construction of 4th Mainland bridge in 1st quarter of 2024

Published

on

4th Mainland bridge

Lagos to flag off construction of 4th Mainland bridge in 1st quarter of 2024

… Experts Discuss Possible Challenges

There are indications that the Lagos State government will kick start the long-awaited 4th Mainland Bridge in the first quarter of 2024, THE WHISTLER understands.

Proposed in 2006, the project is expected to cost about $2.5 billion.

The proposed bridge is about 37 kilometres with a design speed of 140km and spans from Abraham Adesanya in Ajah to the North West towards the Lagoon shoreline of the Lagos-Ibadan Expressway through Owutu/Isawo in Ikorodu.

It is a Public-Private Partnership (PPP) project. Upon completion, it is expected to be the longest bridge in Africa with three toll plazas, nine interchanges and a 4.5km Lagoon Bridge.

Apart from opening new areas of Lagos for future developments, the project is also expected to reduce traffic congestion on the existing Carter, Eko and Third Mainland Bridges.

However, the execution of the project may face some challenges. Lagos State government had in 2015 attributed the delay in the construction of the bridge to issues around compensation, because of the number of buildings along the right of way. And had to redesign it to avoid compensations running into billions.

According to Aramide Adeyoye, a former Special Adviser on Works to Governor Babajide Sanwo-Olu, about 800 structures would be affected by the construction of the bridge.

Sanwo-Olu has about three and a half years to complete his tenure. And the 4th Mainland Bridge is one of the legacy projects he intends to complete.

Others are the 2nd phase of the Blue Line rail and Omu Creek Road, which are wholly Lagos State government projects.

Although the 4th Mainland Bridge is a PPP, the Chief Press Secretary to the governor, Gboyega Akosile, told THE WHISTLER that the government still has to put certain things in place to ensure smooth commencement of the project.

He explained that the project would have kick-started this year, but was shifted to next year because engineers were not yet done with the technical details.

READ ALSO:

“In actual fact, we thought that we could start the 4th Mainland Bridge this year. But because they (engineers) are still working on the technical details, we can’t do the turning of the salt this year. So it has to be next year. And I want to believe it would be first quarter of next year,” Akosile told THE WHISTLER.

“The 4th Mainland Bridge is a PPP model they’re working on. But the Blue Line – the second phase of it – it’s still going to be PPP, but it’s a wholly Lagos State government project. And the Omu Creek Road – that one is also a wholly Lagos State government project.”

Preferred Bidder

In December 2022, the state government announced Messrs CCECC-CRCCIG Consortium as the preferred bidder for the proposed bridge.

The state had in November 2019, called for bidders, with a total of 52 responses received. Out of this, 32 were responsive.

According to the former Special Adviser to Sanwo-Olu on PPP, Ope George, after the evaluation of the Request for Quotation (RFQ), six bidders were selected to progress to the Request for Proposal (RfP) phase with CCECC-CRCCIG Consortium being chosen as the preferred bidder.

“You will recall that the Lagos State government commenced a Competitive Bidding process for the selection of a Concessionaire, by the issuance of the Request for Expressions of Interest (REOI) on 27th of November, 2019. A total of 52 responses were received with 32 being responsive,” George had said during a briefing.

“Subsequently, a Request for Quotation (RFQ) was issued on 10th February 2020 to the 32 eligible applicants and responses were received on 15th April, 2020 with a total of 15 responses. Upon evaluation, six bidders met the criteria to progress to the Request for Proposal (RfP) stage”, he added.

George explained that while Messrs. CCECC-CRCCIG Consortium emerged as the preferred bidder, Messrs. Mota-Engil (Nigeria & Africa), CCCC & CRBC Consortium is the reserved bidder for the project.

The PPP agreement is a 40-year plan for the concessionaire to operate and maintain the bridge, in order to recoup investment on the project.

But this is not the first time significant progress had been made on the project only to be stalled. In May 2016, former Governor Akinwunmi Ambode, signed a Memorandum of Understanding (MoU) with a consortium of firms and finance houses comprising of Africa Finance Corporation (AFC) and Access Bank, Julius Berger Nigeria Plc, Nigerian Westminster Dredging and Marine, J.P. Morgan, Hi-tech Construction Limited, Eldorado Nigeria Limited, and Visible Asset Limited.

However, the government announced in May 2017, that the deal had been cancelled, citing delay by the consortium to kick start the project as the reason for its decision.

$1.352bn Partnership With Afrexim, Access Banks

In October, Lagos secured a partnership deal with the African Export-Import Bank and Access Bank for an investment of $1.352 billion in the state.

READ ALSO:

The agreement was signed at the Africaribbean Trade and Investment Forum 2023, held in Georgetown, Guyana.

The fund would facilitate Lagos’ various long-term infrastructure and investment projects, including the 4th Mainland Bridge.

Other targeted infrastructure projects to be financed with the fund are: Omu Creek Project, and the 2nd Phase of the LRMT Blue Line from Mile 2 to Okokomaiko.

“It was a significant moment in Guyana at the Africaribbean Trade and Investment Forum 2023 as we’ve secured a partnership with the African Export-Import Bank and Access Bank for a massive investment of $1.352 billion in Lagos.

“This investment will power our long-term infrastructure projects, demonstrating confidence from international and local partners in our growing economy.

“As we move forward, this investment will help us realize key projects, including the Fourth Mainland Bridge, Omu Creek Project, and the 2nd Phase of the LRMT Blue Line from Mile 2 to Okokomaiko. We’re committed to creating a better future for Lagos and its people.

“Our vision for Lagos is becoming a reality with the Lekki-Epe International Airport and the Lagos Food Systems and Logistics Hub in Epe. These projects will further boost our economy and serve generations to come.

“The future of Lagos is brighter than ever,” Sanwo-Olu said via his social media handles.

Possible Challenges

A PPP expert, Dr. Chukwuma Katchy, identified two possible challenges the project may face.

The challenges, he said, are incapability of public sector to implement PPP projects and issues around bankability of the project.

“It will face both the challenges all projects face and challenges peculiar to PPP projects. One of the greatest challenges as a PPP project is lack of public sector capacity to implement PPP projects.

“Another major problem is bankability of the project. Bankability refers to a project being structured in a manner as to attract lenders to lend money to the project under project finance kind of lending,” Chukwuma told THE WHISTLER.

He recommended training for public officials that would be involved in the implementation of the project and constant engagement of the public through communication.

“It’s difficult to recommend from outside but my advise is that the public officials involved in the implementation be trained up to being certified by APMG as Certified PPP Professionals (foundation) minimum .
“Secondly, there should be greater public communication by constantly briefing the public every three months,” Chukwuma said.

Highlighting the positives under PPP arrangement, the retired commissioner of police said it reduces the government’s financial and administrative burdens in a project.

READ ALSO:

Emeka Ibe, a Managing Consultant at James Daniel Consulting, listed legal framework agreeable to the two parties and the macroeconomic environment as possible challenges.

“One of the major challenges of a PPP is to have a proper legal framework agreeable to the two parties.

“Secondly, the macroeconomic environment will always provide constant challenges,” Ibe told THE WHISTLER.

Touching on the positives under PPP arrangement for building of infrastructure, he said: “There are positives in any properly contracted PPP project, and the major one is that the government can realize its major project without necessarily providing the funding.

“Additionally, the private partner will provide its capital and expertise and will most likely complete the project on schedule.”

Ibe maintained that a properly designed PPP is mutually beneficial to all its stakeholders and should be supported.

Also speaking with THE WHISTLER, John Davie, the Chairman of an independent advisory group, Altra Capital, mentioned that PPPs have failed in Lagos in the past, citing Lekki-Epe Expressway PPP, which was awarded in 2003. While construction started in 2006, Davie said financial closure was not reached until two years after. He described it as a ‘classic mistake’.

He explained that because the state did not employ external, legal, financial or technical advisors for Lekki-Epe Expressway PPP, mistakes were made.

Davie, however, pointed out that Lagos has learned from its mistakes and has “proceeded very professionally” with the proposed 4th Mainland.

The author of “The PPP Book: Public Private Partnerships Unbundled”, described the engagement of KPMG as advisers for the project as a good decision.

He said: “PPPs involve long term liabilities. I believe in the 4th Mainland Bridge PPP involves a concession for around 40 years. Sizeable PPP projects require large private sector investments with both significant equity investment, which will be at risk, as well as long term debt. The overall financial commitment for the 4th Mainland Bridge will be around US$ 2.2bn. In a PPP structure the government does not usually provide the in initial construction cost.

“However PPPs have failed in Lagos in the past. By contrast the Lekki-Epe Expressway PPP, awarded in 2003, was undertaken prior to Nigeria’s PPP regulations. Construction began in 2006 before financial close which did not occur until 2008. That is a classic mistake. Lagos State Government provided a guarantee which was backed by Federal government.

“Unlike the new 4th Mainland Bridge PPP, Lagos State Government did not employ external, legal, financial or technical advisors and did not have a proper financial model for the project. There were many mistakes including government interference and indecision, all of which resulted in Lagos State Government having to buy out private sector. Anyone who has listened to the capacity building lectures which I have given over several year in Nigeria will know that this could all have been avoided.”

To ensure that PPP for infrastructure like the 4th Mainland Bridge works, Davie who is a visiting professor at the Guildhall School of Business and Law, London Metropolitan University, said it has to be well structured and regulated.

“Success requires a careful balance between risk and reward: PPPs that do not transfer risk, and thereby benefit from the private-sector’s risk-management capabilities, are likely to disappoint. So, the public sector must commission a very thorough and detailed feasibility study as a first step,” he said.

“With appropriate contract conditions and a sound procurement process a PPP for the 4th Mainland Bridge should be a success. Lagos State Government has addressed this project in a thorough professional and competent way.”

Loading

News

Omokri Arrives in Mexico to Assume Duty as Nigerian Ambassador, Thanks Govt for Ministerial Reception

Published

on

Reno Omokri Arrives in Mexico to Assume Duty as Nigerian Ambassador, Thanks Government for Ministerial Reception

Omokri Arrives in Mexico to Assume Duty as Nigerian Ambassador, Thanks Govt for Ministerial Reception

 

 

MEXICO CITY, Mexico — Former presidential aide and political commentator, Bemigho Reno Omokri, has arrived in Mexico City to take up his appointment as Nigeria’s Ambassador Extraordinary and Plenipotentiary to the United Mexican States.

 

Omokri announced his arrival in a social media post on Tuesday, November 24, expressing appreciation to the Mexican government for the reception accorded him and his family upon their arrival in the Mexican capital.

 

The newly appointed Nigerian envoy particularly acknowledged the decision of the Mexican authorities to assign a minister to welcome him, describing the gesture as a demonstration of diplomatic courtesy.

 

In his statement, Omokri said:

 

“I thank the Government of the United Mexican States for sending a minister to receive my family and I upon my arrival in Mexico City to resume as Nigeria’s Ambassador.”

 

His arrival marks an important development in his diplomatic career and brings an end to months of uncertainty surrounding his deployment following his appointment by President Bola Tinubu.

 

Eight-Month Wait Before Mexico’s Approval

 

Omokri’s diplomatic journey to Mexico followed a lengthy approval process that generated public attention after his appointment was announced by the Federal Government.

 

President Tinubu nominated him for an ambassadorial position in November 2025, alongside several other prominent Nigerians, including former Minister of Aviation, Femi Fani-Kayode, and former Chairman of the Independent National Electoral Commission, Professor Mahmood Yakubu.

 

The Senate subsequently confirmed the ambassadorial nominees in December 2025.

 

On March 6, 2026, President Tinubu approved the posting of 65 ambassadors-designate and high commissioners to their respective countries, with Omokri assigned to Mexico.

 

However, his deployment could not proceed immediately because the Mexican government had yet to communicate its formal acceptance of his appointment.

 

In August 2026, Nigeria’s Ministry of Foreign Affairs disclosed that Mexico and Japan were among the countries that had not communicated formal acceptance of outstanding ambassadorial appointments.

 

Mexico Eventually Grants Diplomatic Approval

 

The uncertainty surrounding Omokri’s posting was resolved in October 2026 when Mexico formally granted the diplomatic approval required for his appointment.

 

The approval, known as agrément, was delivered to Nigeria’s Ministry of Foreign Affairs by the Chargé d’Affaires of the Mexican Embassy in Abuja, José Manuel Briseño Flores.

 

The document was presented to the ministry’s Director of Protocol, Ambassador Babagana Wakil.

 

Omokri subsequently announced the development, expressing gratitude to the Mexican government for accepting his appointment.

 

He also confirmed that his diplomatic responsibilities would extend beyond Mexico, covering concurrent accreditation to Guatemala, Honduras and Nicaragua.

 

Omokri Had Earlier Addressed Rejection Claims

 

Before Mexico granted its approval, speculation had emerged in some quarters that the North American country might have rejected Omokri’s nomination.

 

However, the former presidential aide dismissed such suggestions during an appearance on Channels Television’s Politics Today in June 2026.

 

He maintained that Mexico had not rejected his appointment, explaining that diplomatic procedures and other administrative considerations were responsible for the delay.

 

Omokri also linked the timeline to preparations for the 2026 FIFA World Cup, which Mexico is co-hosting with the United States and Canada.

 

The Ministry of Foreign Affairs had similarly indicated that diplomatic engagements were ongoing with countries yet to communicate their acceptance of some Nigerian ambassadorial nominees.

 

Diplomatic Responsibilities and Next Steps

 

With his arrival in Mexico City, Omokri is expected to begin representing Nigeria’s diplomatic, economic and strategic interests in Mexico and the three other countries under his concurrent accreditation.

 

His responsibilities will include strengthening bilateral relations, promoting trade and investment opportunities, facilitating cooperation in areas of mutual interest and advancing Nigeria’s interests within the region.

 

However, the date for his formal presentation of letters of credence to the Mexican President has not yet been publicly announced.

 

The presentation of letters of credence is a significant stage in diplomatic accreditation, formally recognising an ambassador’s authority to represent his country before the receiving state’s head of state.

 

Omokri previously served as a media aide to former President Goodluck Jonathan before becoming widely known as an author, social commentator and political commentator.

 

His arrival in Mexico City represents the transition from his previous public engagements in Nigeria to a formal diplomatic assignment representing the Federal Republic of Nigeria abroad.

 

 

Omokri Arrives in Mexico to Assume Duty as Nigerian Ambassador, Thanks Govt for Ministerial Reception

Loading

Continue Reading

News

Katsina Govt Restricts Emir of Daura’s Official Duties, Sets Up Probe Panel Over Sexual Assault Allegation

Published

on

Katsina Govt Restricts Emir of Daura’s Official Duties, Sets Up Probe Panel Over Sexual Assault Allegation

Katsina Govt Restricts Emir of Daura’s Official Duties, Sets Up Probe Panel Over Sexual Assault Allegation

The Katsina State Government has constituted an investigative committee to probe allegations of sexual assault involving the Emir of Daura, Alhaji Umar Faruk Umar, and a foreign female tourist, following widespread public outrage over a viral video purportedly showing an encounter between the traditional ruler and the visitor inside his palace.

As part of its immediate response, the state government has suspended the Emir’s official engagements and travels pending the conclusion of the investigation.

The decision represents a significant development in the controversy surrounding the 92-year-old monarch, whose alleged conduct has generated intense debate across Nigeria and attracted the attention of international human rights organisations.

The state government’s position was contained in a statement issued on Tuesday, November 24, by the Commissioner for Information and Culture, Dr Bala Salisu Zango, on behalf of the government.

According to the statement, Governor Dikko Umaru Radda expressed serious concern over the allegations and directed the immediate establishment of an investigative committee to examine the circumstances surrounding the reported incident.

The committee is expected to investigate the allegations, establish the relevant facts and advise the government on the appropriate steps to take.

The government also assured residents that the committee’s findings and recommendations would be fully implemented, stressing its commitment to ensuring that justice is served.

It further appealed to members of the public to remain calm, law-abiding and refrain from actions capable of disrupting public peace while the investigation continues.

How the Controversy Started

The controversy erupted after a Polish female tourist, identified as Mirka Czee, who operates the Instagram account @beduinqa, shared a video and an account of what she described as an unpleasant encounter with the Emir during her visit to his palace in Daura on November 14, 2026.

READ ALSO:

The tourist had reportedly completed a 30-day tour of Nigeria, during which she visited several cities and communities, including Lagos, Ibadan, Abeokuta, Osogbo, Ilorin, Abuja, Jos, Bauchi, Kano, Zaria, Katsina and Daura.

According to her account, she was welcomed to the Emir’s palace, where she was introduced to the traditional ruler and subsequently taken around the palace to learn about the history and cultural significance of Daura.

She said she was later brought back to meet the Emir and was left alone with him in a large room.

Recounting the incident, Mirka alleged that the monarch asked her to sit close to him before holding her hand and playing with it in a manner that made her uncomfortable.

She claimed that despite expressing her discomfort, the Emir continued the physical interaction.

The tourist further alleged that as she prepared to leave, the monarch hugged her, kissed her on the cheek and subsequently touched her breasts without her consent.

She said she repeatedly protested against the alleged conduct, expressing disbelief that such an encounter could happen inside the palace of a traditional ruler.

Mirka also disclosed that she recorded portions of the encounter using Meta smart glasses equipped with a camera.

She explained that she decided to make the incident public after leaving Nigeria because she believed other women might have experienced similar situations without having the opportunity to document or report them.

Emirate Council Begins Examination of Viral Video

Following the circulation of the video, the Daura Emirate Council confirmed that it was aware of the allegations and had commenced an examination of the footage.

READ ALSO:

The council’s spokesman, Ibrahim Murtala, reportedly disclosed during a telephone interview with Alfijir Radio that the traditional institution was investigating the authenticity of the recording.

He said the council was examining whether the video was genuine or had been manipulated or digitally altered using modern technology.

According to him, the Emirate Council would issue an official statement after completing its examination.

Meanwhile, a palace source who spoke anonymously to PUNCH reportedly dismissed the tourist’s allegations, insisting that nothing untoward happened during her visit.

The source acknowledged that the woman visited the palace but described her account as fabricated.

However, the source was not authorised to speak officially on behalf of the Emirate Council.

Amnesty International, Other Groups Demand Investigation

The controversy has also attracted reactions from human rights organisations, particularly Amnesty International, which called on the Katsina State Government and the Nigeria Police Force to conduct an independent and transparent investigation.

Amnesty described the allegations as disturbing and insisted that nobody should be above the law, regardless of age, position or traditional authority.

The organisation also called for accountability if the allegations were established, while emphasising the importance of a fair legal process.

Similarly, the Centre for Information Technology and Development (CITAD), through its Male Feminists Network, demanded an independent investigation and urged the authorities to preserve and examine all available evidence.

The Human Rights Writers Association of Nigeria (HURIWA) also called for justice for the tourist, insisting that the investigation should not be compromised by the status of the traditional ruler.

Police Position and Calls for Accountability

The development followed growing calls for the Emir’s suspension by prominent Nigerians.

Former Military Governor of Kaduna State, Colonel Abubakar Dangiwa Umar (retd.), had written an open letter to Governor Radda, urging him to suspend the monarch pending a thorough and impartial investigation.

Umar argued that the suspension would not amount to a declaration of guilt but would demonstrate that traditional authority should not place anyone beyond accountability.

He further maintained that if the allegations were established, the appropriate authorities should take decisive action, including the possibility of removing the Emir from the throne.

Meanwhile, Premium Times reported on November 23 that the Katsina State Police Command had said it had not received a formal complaint concerning the alleged incident.

Investigation Expected to Determine Next Steps

The Katsina State Government’s decision to restrict the Emir’s official engagements and travels while establishing an investigative committee has introduced a new dimension to the controversy.

The outcome of the investigation is expected to determine the next steps the government may take concerning the traditional ruler.

For now, the allegations remain unproven, and the establishment of the committee should not be interpreted as a finding of guilt against the Emir.

The matter has nevertheless generated important questions about accountability, the responsibilities attached to traditional institutions and the protection of visitors, particularly women, within places of authority.

As the investigation begins, attention will be focused on whether the committee can establish the facts surrounding the encounter and deliver findings capable of addressing the concerns raised by the tourist and the wider public.

Katsina Govt Restricts Emir of Daura’s Official Duties, Sets Up Probe Panel Over Sexual Assault Allegation

Loading

Continue Reading

News

Court Freezes Nigerian Governors’ Forum Accounts Over N135.5bn Paris Club Funds

Published

on

NGF Distances Itself From Paris Club Refund Transaction

Court Freezes Nigerian Governors’ Forum Accounts Over N135.5bn Paris Club Funds

 

 

 

ABUJA, Nigeria — The Nigerian Governors’ Forum (NGF) has suffered a major legal setback following an order by the High Court of the Federal Capital Territory (FCT), Abuja, directing the freezing of $100 million, equivalent to approximately N135.58 billion, linked to the controversial Paris Club refunds dispute.

 

The court also ordered 29 commercial banks operating in Nigeria to preserve funds belonging to the NGF in their custody up to the disputed amount, pending further proceedings in a legal battle over outstanding professional fees allegedly owed to a legal practitioner.

 

The interim order was granted on November 19, 2026, by Justice O.C. Agbaza, following an ex parte application filed by Dr Ted Iseghohi-Edwards, who is seeking to recover the money under an indemnity allegedly issued by the governors’ umbrella body.

 

The case involves the Incorporated Trustees of the Nigerian Governors’ Forum as the first respondent, while 29 commercial banks were joined as co-respondents.

 

Court Restrains NGF From Accessing Disputed Funds

 

In granting the application, Justice Agbaza issued an interim Mareva injunction restraining the Incorporated Trustees of the NGF, their agents, representatives and other persons acting on their behalf from withdrawing, transferring, dissipating, concealing or otherwise dealing with the disputed $100 million or its naira equivalent.

 

The restriction is intended to preserve the funds while the court considers the substantive application for an interlocutory injunction.

 

The judge also extended the restrictions to the 29 banks, directing them not to release, transfer, convert, withdraw or otherwise deal with funds belonging to the NGF within their custody up to the aggregate amount covered by the order.

 

The financial institutions were further directed to disclose, within 48 hours of receiving the court order, whether the NGF maintains accounts with them containing the disputed funds.

 

They are also required to identify the relevant accounts, disclose their currencies and available balances, and state the amounts preserved in compliance with the order.

 

How The N135.5bn Dispute Started

 

The dispute reportedly arose from an indemnity dated December 20, 2018, allegedly issued by the Nigerian Governors’ Forum to Dr Iseghohi-Edwards.

 

The arrangement was connected to the Federal Government’s payment of $100 million to the NGF as a stakeholder in the Paris Club refunds controversy.

 

According to the claimant’s case, the money was held under an arrangement pending the determination of the Federal Government’s liability for professional legal and consultancy fees arising from the refund transactions.

 

Iseghohi-Edwards is contending that the condition contained in the indemnity has been fulfilled, thereby making the $100 million payable to him.

 

He is consequently seeking to recover the amount, which translates to approximately N135.58 billion based on the applicable exchange rate used in the court proceedings.

 

The claimant reportedly maintained that the indemnity issued by the NGF established its obligation to pay him once the relevant condition concerning the Federal Government’s liability had been satisfied.

 

Claimant Alleges NGF Failed To Honour Payment Undertaking

 

In pursuing the matter, Iseghohi-Edwards told the court that he formally demanded payment from the NGF through a letter dated October 8, 2026.

 

However, he alleged that the forum failed to honour the undertaking contained in the indemnity, prompting him to seek judicial intervention to recover the disputed amount.

 

He expressed fears that the money could be transferred, disbursed or otherwise dissipated before the determination of his substantive claim, potentially making it difficult to enforce any eventual judgment in his favour.

 

The claimant also reportedly informed the court that he could not independently establish the specific bank accounts holding the funds without an appropriate judicial order.

 

He therefore argued that the interim injunction was necessary to preserve the subject matter of the dispute and prevent the proceedings from being rendered ineffective.

 

The application was brought pursuant to Orders 30(3) and 32(1) of the High Court of the Federal Capital Territory Civil Procedure Rules, alongside the court’s inherent jurisdiction.

 

The claimant also undertook to abide by any order for damages should the court subsequently determine that the interim injunction ought not to have been granted.

 

29 Commercial Banks Affected By The Order

 

Among the financial institutions listed as respondents in the case are Access Bank, Alpha Morgan Bank, Ecobank Nigeria, Fidelity Bank, First Bank of Nigeria, Sterling Bank, United Bank for Africa, Unity Bank, Zenith Bank and Jaiz Bank.

 

Others include Guaranty Trust Bank, Keystone Bank, Stanbic IBTC Bank, Standard Chartered Bank, Wema Bank, Union Bank of Nigeria, First City Monument Bank, Lotus Bank, Parallex Bank and Polaris Bank.

 

The remaining banks are Globus Bank, SunTrust Bank, Citibank Nigeria, Nova Bank, Optimus Bank, Premium Trust Bank, Signature Bank, Tatum Bank and Titan Trust Bank.

 

The order requires the banks to preserve any funds belonging to the NGF in their custody up to the aggregate sum of $100 million or its naira equivalent.

 

The directive also requires them to provide the necessary account information within the stipulated 48-hour period after service of the order.

 

Court Fixes December 1 For Further Hearing

 

Justice Agbaza has adjourned the matter until December 1, 2026, for the hearing of the claimant’s Motion on Notice seeking an interlocutory injunction.

 

The claimant was also directed to serve the court order and relevant originating processes on all the respondents.

 

The interim Mareva injunction is a preservation measure intended to prevent the disputed funds from being moved or dissipated while the court considers the application for further relief.

 

It does not, in itself, amount to a final determination that the NGF is liable to pay the claimant or that the money has been awarded to him.

 

The December 1 hearing is therefore expected to be an important stage in the legal battle over the disputed $100 million linked to the Paris Club refunds controversy.

 

The development adds another dimension to the longstanding controversy surrounding professional fees, consultancy payments and financial obligations arising from Nigeria’s Paris Club loan refund transactions.

 

 

 

Court Freezes Nigerian Governors’ Forum Accounts Over N135.5bn Paris Club Funds

 

Loading

Continue Reading

Trending