Independence Bridge
FG to close Independence Bridge in Lagos for repairs from April 1
The Federal Government has announced the closure of the Independence Bridge (Marina bound) starting April 1 for essential maintenance and rehabilitation works.
The Federal Controller of Works, Lagos, Mrs Olukorede Kesha, made this known in a statement on Monday in Lagos.
She explained that the bridge would remain closed until the end of May 2025.
READ ALSO:
Accoding to her, the closure will affect traffic traveling from Ahmadu Bello Way and Adeola Odeku towards Marina, Eko Bridge, and Onikan by Zone 2.
Kesha advised motorists to plan their journeys accordingly and use alternative routes to avoid traffic congestion during the repair period.
She apologised for any inconvenience the closure might cause and thanked the public for their understanding and cooperation as the government worked to ensure the safety and stability of road infrastructure.
2027: Ekiti Driver Takes ₦3.5m Loan to Back Tinubu’s Re-election Bid An Ekiti State commercial…
2023 Election: Tinubu’s Camp Dares Obi to Produce Evidence He Won Presidential Poll President Bola…
Electric Mobility: Spiro Unveils Expansion Plan, Names Nigeria New MD Spiro, Africa’s leading electric mobility…
₦60 Fuel Discount: Ondo ADC Slams Tinubu, Says Atiku Deserves Credit for Subsidy Restoration The…
Fresh Kidnap at Cocoa Institute: Gunmen Seize Three Workers in Oyo Gunmen have reportedly abducted…
NAFDAC Disowns Viral Fake Products List, Warns Nigerians of Misinformation The National Agency for Food…