News

FG to pump $800m in power distribution infrastructure, says minister

FG to pump $800m in power distribution infrastructure, says minister

The Minister of Power, Adebayo Adelabu, has announced that the Federal Government is set to release $800 million for the construction of substations and distribution networks as part of the Presidential Power Initiative (PPI).

According to the minister, the investment will be divided into two portions: $400 million for Lot 2, covering the franchise areas of Benin, Port Harcourt, and Enugu Distribution Companies (DISCOs), and $400 million for Lot 3, covering the franchise areas of Abuja, Kaduna, Jos, and Kano DISCOs.

A statement issued on Sunday by Bolaji Tunji, the minister’s Special Adviser on Media and Strategic Communication, quoted Adelabu during a tour of the TBEA Southern Power Transmission and Distribution Industry in Beijing, China.

Adelabu, who is in China for the China-Africa Cooperation Summit, expressed concern over the rejection of power by DISCOs, which recently led to a reduction in generation capacity from a peak of 5,170 megawatts by 1,400 megawatts due to the DISCOs’ inability to manage the supply.

READ ALSO:

However, the minister assured that despite this setback, the government aims to increase power generation to 6,000 megawatts by the end of the year.

During an interactive session with TBEA management, the minister reiterated Nigeria’s commitment to collaborating with world-class organizations like TBEA to realize President Bola Tinubu’s vision for the power sector.

The statement also emphasized the minister’s concern over the outdated and fragile transmission and distribution infrastructure that has historically hampered industrial growth, with over 59 percent of Nigerian industries relying on self-generated power due to grid unreliability.

Adelabu noted that under President Bola Tinubu’s administration, power generation increased from 4,000 megawatts to 5,170 megawatts within a year.

He added that the administration is targeting 6,000 megawatts by the end of the year and 30 gigawatts by 2030.

The President of TBEA Company Limited, Huang Hanjie, expressed the company’s support for Nigeria’s power sector goals and offered to share their extensive global experience in energy provision.

Hanjie commended the recent improvements in power generation and transmission and confirmed TBEA’s interest in contributing expertise to the proposed super grid project.

FG to pump $800m in power distribution infrastructure, says minister

Trends Admin

Recent Posts

Emir of Ilorin Appoints Sheikh Muhammad Bashir Dasuki as New Chief Imam of Ilorin

Emir of Ilorin Appoints Sheikh Muhammad Bashir Dasuki as New Chief Imam of Ilorin ILORIN…

7 hours ago

Bandits Attack Kogi School, Vice Principal, Two Others Killed

Bandits Attack Kogi School, Vice Principal, Two Others Killed   The Kogi State Police Command…

13 hours ago

DSS Raises Alarm Over Planned Mass Abduction of Schoolchildren in Edo

DSS Raises Alarm Over Planned Mass Abduction of Schoolchildren in Edo The Department of State…

15 hours ago

Okonkwo Reacts to Peter Obi’s ₦5bn Lawsuit Threat, Says ‘He’s Looking for Campaign Funds’

Okonkwo Reacts to Peter Obi’s ₦5bn Lawsuit Threat, Says ‘He’s Looking for Campaign Funds’ A…

16 hours ago

US Launches Fresh Strikes on Iran After Apache Helicopter Downing

US Launches Fresh Strikes on Iran After Apache Helicopter Downing The United States on Tuesday launched a…

17 hours ago

12 Killed, Nine Injured in Deadly South Africa Mass Shooting

12 Killed, Nine Injured in Deadly South Africa Mass Shooting At least 12 people have…

17 hours ago