Categories: Railway

New Lagos-Ibadan rail link to Apapa port ready by month end – Minister

The Federal Government has announced that it will actualise the linking of Lagos-Ibadan standard guage rail line to the Apapa port by the end of this month.

Minister of State for Transportation, Senator Gbemisola Saraki, disclosed this in Lagos on Monday, noting that a Customs building housing a radio-active scanner had been obstructing the complete extension of the rail track to the port quay.

She spoke while addressing journalists after an inspection of the affected building at the APM Terminals in the Apapa port.

She said, “By the end of this month, we want to ensure that the removal of this Customs facility which is on the rail track is resolved. The goal is to have this track operational by the end of this month.”

Senator Saraki explained that in the interim, a diversionary line is being constructed while experts’ advice was being sought on the demolition of the Customs scanner building.

Senator Saraki said, “We are here to look at the issues affecting activities to connect the rail to the Apapa seaport.

“As you can see, the construction of this standard gauge has been ongoing for more than two years and I came here to inspect the activities.

“We want to ensure that before the end of next month, the activities here have improved.”

She also said, “Although this building looks big, it is actually a minor issue that will be resolved by the time the Federal Ministry of Transportation, Nigerian Ports Authority (NPA) and Nigeria Customs Service (NCS) seat together to discuss it.”

When asked why the delay over the removal of the Customs scanner building, Saraki said, “Inside the Customs building are radio-active scanners that can be injurious to human health and well-being. So, it is not a building that can just be demolished like any other property.”

“It is a radioactive facility. It has a scanner and we have to ensure that the demolition is done safely by experts.”

At the Tin-Can Island Port, the minister inspected some failed berths and collapsing quays at the Five Star Logistics Terminal and Tin-Can Island Container Terminal (TICT), and revealed that efforts would be geared to repair them without disturbing port operations.

Trends Admin

Recent Posts

BREAKING: Super Eagles qualify for AFCON 2025

BREAKING: Super Eagles qualify for AFCON 2025 The Super Eagles of Nigeria have secured their…

8 hours ago

Disaster averted as bird strike hits Abuja-Lagos Air Peace flight

Disaster averted as bird strike hits Abuja-Lagos Air Peace flight    An Abuja-Lagos flight was…

10 hours ago

NNPC achieves 1.8mbpd crude oil production

NNPC achieves 1.8mbpd crude oil production The Nigerian National Petroleum Company Limited (NNPC Ltd) and…

10 hours ago

BREAKING: FEC proposes N47.9 trillion budget for 2025 fiscal year

BREAKING: FEC proposes N47.9 trillion budget for 2025 fiscal year The federal government has unveiled…

10 hours ago

EFCC arrests ex-NCMB boss over $35m energy project fraud

EFCC arrests ex-NCMB boss over $35m energy project fraud The Economic and Financial Crimes Commission (EFCC)…

10 hours ago

FG gets fresh $134m loan from AfDB for agric projects

FG gets fresh $134m loan from AfDB for agric projects The Federal Government has secured a…

10 hours ago