Railway

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

The Lagos State Government has taken steps to address persistent flooding within the Ebute-Meta railway corridor and adjoining communities with the construction of a major stormwater drainage channel in collaboration with the Nigerian Railway Corporation.

The NRC said the state government had awarded a contract for the construction of the Carter-Railway Channel, also known as System 4, aimed at deflooding the railway compound as well as parts of Olaleye and neighbouring areas within Lagos Mainland Local Government Area.

The reinforced concrete drainage channel will run from Murtala Muhammed Way in Ebute-Meta through the railway corridor to a discharge point at Iponri on Western Avenue.

Speaking at a stakeholders’ meeting held at the railway premises, the Director of Drainage Services at the Lagos State Ministry of Environment and Water Resources, Engr.

READ ALSO:

Adedapo Ajadi, said the project would permanently address the perennial flooding that has affected residents, institutions and businesses in the area for years. He added that construction work is expected to last about 18 months and urged stakeholders to cooperate with contractors to ensure smooth execution.

Stakeholders at the meeting included representatives of St Saviour’s School, NTA Channel 10, the Railway Museum, Federal Medical Centre Ebute-Meta, CCECC quarters, churches, mosques, as well as industrial and small business operators within the railway corridor.

Managing Director of the Nigerian Railway Corporation, Dr Kayode Opeifa, described the intervention as timely, assuring that the corporation would give full support to the multi-billion-naira project.

He noted that the infrastructure, when completed, would significantly reduce flooding and improve safety within the railway environment and neighbouring communities.

Some stakeholders welcomed the development, saying annual flooding had disrupted academic, medical and commercial activities in the area and posed risks to lives and property.

Officials of the Lagos State Government and the NRC later carried out a joint inspection of the proposed corridor to assess the alignment and identify areas that may be affected before construction begins.

 

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

Trends Admin

Recent Posts

Kwankwasiyya Urges US Congress to Drop Kwankwaso’s Name from Bill

Kwankwasiyya Urges US Congress to Drop Kwankwaso’s Name from Bill The Kwankwasiyya movement has called…

4 minutes ago

Liverpool Edge Sunderland 1-0 to Halt Impressive Home Streak

Liverpool Edge Sunderland 1-0 to Halt Impressive Home Streak Liverpool brought an end to Sunderland’s…

21 minutes ago

Drama at NASS as Works Minister, Oshiomhole Clash During Budget Defence

Drama at NASS as Works Minister, Oshiomhole Clash During Budget Defence Tempers flared at the…

29 minutes ago

Deji Adeyanju Mocks El-Rufai Over Alleged Arrest Plot

Deji Adeyanju Mocks El-Rufai Over Alleged Arrest Plot Human rights lawyer Deji Adeyanju has mocked…

41 minutes ago

Omokri Defends Electronic Transmission, Questions Feasibility of Real-Time Results in Nigeria

Omokri Defends Electronic Transmission, Questions Feasibility of Real-Time Results in Nigeria Former presidential candidate and…

47 minutes ago

Jakande’s servant-leadership mindset remains relevant — Olurode

Jakande’s servant-leadership mindset remains relevant — Olurode   LAGOS — A retired Professor of Sociology…

1 hour ago