Railway
Cash payment: NRC says e-ticketing on Lagos-Ibadan, Warri-Itakpe lines coming soon
The Nigerian Railway Corporation says it is still demanding cash from passengers riding on the Lagos-Ibadan and Warri-Itakpe trains because the e-ticketing along the corridors is being perfected.
It appealed to the passengers to bear with the corporation as it would soon roll out the e-ticket along the two corridors already being enjoyed by those using the Abuja-Kaduna train.
It stated this in a statement issued on Monday in reaction to reports that the NRC was rejecting electronic transfer of train fare by passengers in the face of cash scarcity many Nigerians are currently going through following the naira redesign by the Central Bank of Nigeria.
The statement, issued by the NRC Public Relations Deputy Director, Yakub Mahmood, was entitled ‘NRC Not Rejecting Electronic Transfer’.
It read, “The Board and management of the Nigerian Railway Corporation (NRC)’s attention has been drawn to news trending on the social and mainstream media platforms, claiming that NRC does not accept electronic transfer and old naira notes, for train boarding ticketing at their various passenger Train Stations, especially Lagos – Ibadan Train Service (L.I.T.S) and Warri — Itakpe Train Service (W.I.T.S).
“As we are all aware of the currency policy, introduced by the Federal Government, which redesigned some denominations of naira notes that are being gradually swapped with the old Naira notes, pending when the transition from old to new will be completed.
“We only accept physical cash across – the — counter for train boarding with the Naira Notes approved as Legal Tender by the government.However, on the Abuja – Kaduna Train Service (AKTS), passengers have been enjoying the on-line electronic train ticketing system seamlessly, for quite some time now.
“NRC is therefore appealing to our esteemed passengers, especially along LITS and WITS routes, to bear with us, especially during this temporary commercial transaction challenges, as we are bracing to deploy the online train ticketing system on the LITS and WITS routes soon, with far reaching arrangement being concluded for hitch-free deployment of the technology.
“Meanwhile, we appreciate your patronage and absolute patience before we finally migrate to the on-line electronic passengers’ train ticketing system in our entire train operations/services.”
Railway
Lagos Rail Mass Transit part of FG free train ride – NRC
Lagos Rail Mass Transit part of FG free train ride – NRC
The Nigerian Railway Corporation (NRC) has disclosed that the Lagos Rail Mass Transit (LRMT) trains are included in the Federal Government’s free train ride initiative for the Christmas and New Year celebrations.
The LRMT, which currently includes the Phase 1 Blue Line Rail and the Phase 1 of the Red Line Rail, operates under the Lagos Metropolitan Area Transport Authority (LAMATA).
This announcement was made by Ben Iloanusi, the Acting Managing Director of the NRC, during an interview on NTA News TV on Friday, following the launch of the initiative earlier that day.
While Iloanusi stated that Phase 1 of both the Blue Line and Red Line Rail projects are part of the program, LAMATA has yet to confirm this inclusion.
READ ALSO:
- Nigeria denies alleged plot to destabilise Niger Republic
- Navy arrests 19 Nigerians attempting to reach Europe by hiding on ship
- Troops arrest four Ambazonian rebels in Taraba
Iloanusi outlined the other routes benefiting from the scheme, which include the Lagos-Ibadan Train Service, Kaduna-Abuja Train Service, Warri-Itakpe Train Service, Port Harcourt-Aba Train Service, and the Bola Ahmed Tinubu Mass Transit in Lagos. Notably, little was previously known about the Bola Ahmed Tinubu Mass Transit service until this disclosure.
“Let me mention the routes where this free train service is happening. We have the Lagos-Ibadan Train Service, we have the Kaduna-Abuja Train Service, we have the Warri-Itakpe Train Service, we have the Lagos Rail Mass Transit trains, we have the Port Harcourt-Aba Train Service, and we have what we call the Bola Ahmed Tinubu Mass Transit, which is also in Lagos,” he stated.
Iloanusi provided operational updates, stating that passengers nationwide can access free tickets online or, for those unable to do so, at train stations where they will be profiled and validated.
He noted that passengers using NRC-managed services (excluding the Lagos Rail Mass Transit) should reserve tickets via the official website, www.nrc.gov.ng, with a valid ID required. He also advised travelers to plan, arrive on time, and bring valid identification.
Lagos Rail Mass Transit part of FG free train ride – NRC
Railway
NRC announces special Xmas, end-of-year train service
NRC announces special Xmas, end-of-year train service
The Nigerian Railway Corporation (NRC) says it will operate an end of the year special train service on all its routes across the country.
It announced this in a statement on Wednesday by its Deputy Director, Public Relations, Yakub Mahmood, saying it was in compliance with the Federal Government’s directive through the Federal Ministry of Transportation.
It however did not indicate if the special train service would be free or not.
The Federal Government last year similarly declared special train services for Christmas and New Year, which were made free for all users.
The statement added the modality for this year’s special service would be released soon.
The latest statement read, “The management of the Nigerian Railway Corporation (NRC), in compliance with the Federal Government’s directive through the Federal Ministry of Transportation, hereby informs the general public that the NRC shall operate end of the year special train services in commemoration of Christmas and New Year celebrations.
“This end-of-the-year special train service on scheduled passenger trains, is part of the government’s gesture towards an enjoyable end of the year celebration.
“Dates and modalities of the end-of-the-year Special Train Service shall be communicated in due course. We wish all our esteemed customers a Merry Christmas and a Happy New Year in advance.”
Railway
FG hands over $3bn Port Harcourt-Aba railway project to NRC
FG hands over $3bn Port Harcourt-Aba railway project to NRC
The 62-kilometre, $3.02 billion Port Harcourt-Aba railway project has been completed by Federal Government and handed over to the Nigerian Railway Corporation (NRC).
The Port Harcourt-Aba section is part of the larger Port Harcourt-Maiduguri eastern narrow gauge railway project, initiated under the administration of President Muhammadu Buhari.
The project supervisor, Federal Ministry of Transportation, Ayo Dada, formally transferred the railway to the NRC during a brief ceremony held on Thursday in Port Harcourt.
He said that the project, completed in May, had significantly improved passenger movement between Rivers and Abia, thereby enhancing their economies.
“The assets handed over include dismantled tracks measuring 283.060 km, rehabilitated and reconstructed 62.800 km of subgrade and the laying of 62.800 km of rail for the main line,” Dada said.
“This includes the laying of rail for sliding lines covering 5.690 km and the reconstruction of 27 sets of turnouts at Port Harcourt, Elelenwo, Obuzor, Umugo and Aba Stations, among others.”
Dada said that with the handover of the Port Harcourt–Aba section, the Federal Government would focus on the Port Harcourt–Maiduguri phase of the project.
READ ALSO:
- Naira appreciates to N1,740/$ in parallel market
- Reform Bills propose 55 per cent VAT revenue for states
- Nigeria ranks 4th among Africa’s most improved visa friendly nations
“The contractor has submitted the technical specifications and maintenance manual for the Port Harcourt–Aba section to the consultants.
“The ministry is committed to completing this project, which will foster national development,” he said.
The Managing Director of the NRC, Ben Iloanusi, commended the Federal Government and the ministry of transportation for the timely completion and transfer of the project.
Iloanusi, represented by the NRC Deputy Manager (Civil), Adesegun Ogunade, said that the railway had greatly benefited Nigerians seeking affordable transportation options.
“The rail line, now in operation, has started mitigating the impact of high transportation costs caused by economic challenges,” he said.
“Train services have been running for some time and passengers have reported that it has made commuting between Port Harcourt and Aba more convenient, faster and cheaper.
“People are already experiencing the benefits of this government’s policies and programmes.’’
He assured that the Port Harcourt–Maiduguri section would also be completed in due course, emphasising that adequate security arrangements had been made to ensure the safety of workers and passengers.
FG hands over $3bn Port Harcourt-Aba railway project to NRC
-
Railway1 day ago
Lagos Rail Mass Transit part of FG free train ride – NRC
-
metro2 days ago
Court stops customs from seizing imported rice in open market
-
metro7 hours ago
Why we displayed ‘Jesus Christ is not God’ banner at Lekki mosque -Imam
-
metro2 days ago
Ibadan stampede: Tinubu orders probe as death toll hits 40
-
metro1 day ago
Ibadan stampede: Ooni reacts after arrest of ex-wife
-
metro2 days ago
Afe Babalola: Court grants Dele Farotimi bail, barred from media interviews
-
metro1 day ago
NIMC warns against extortion, reaffirms free NIN enrollment
-
News2 days ago
Adebayo Ogunlesi, 2 other Nigerians make Forbes 50 wealthiest Black Americans list 2024