Train attack: 186 now confirmed safe, 22 missing, 51 others unreachable - Newstrends
Connect with us

Railway

Train attack: 186 now confirmed safe, 22 missing, 51 others unreachable

Published

on

The Nigerian Railway Corporation has confirmed the safety of 186 passengers on the Abuja-Kaduna train attacked by terrorists last Monday’s near Kaduna, representing an increase of 14 persons from the last tally.

It also said in the latest statement that 22 passengers had been reported missing by their relatives; the phones of 35 people on the train manifest were ringing when called but no-one responded; just as the mobile phone numbers of 51 others were unreachable.

The development is coming exactly one week after the train was attacked in the Kateri-Rijana area of the state.

Musa-Lawal Ozigi, TUC secretary-general; Akin Akinsola, TUC Kwara chairman; and Chinelo Nwando Megafu, a dental surgeon, were among those who died in the attack

Giving an update in a statement issued on Sunday, the NRC Managing Director, Fidet Okhiria, said, “Fifty-one phone numbers on the manifest are either switched off or not reachable since Tuesday morning.”

READ ALSO:

He said 35 phone numbers “are ringing but no response from the other end” while 60 phone numbers, when called, are said to be non-existent.

“Two coaches earlier re-railed were safely moved to Rigasa Station. This brings the total number of recovered coaches and safely moved to NRC stations to 7,” he said.

“Intensive work continues on track repairs. More concrete sleepers were moved to site while some section of twisted tracks has been straightened.”

Since the incident, only eight passengers on board the train have been confirmed dead.

The NRC had announced the suspension of the Abuja-Kaduna railway operations following the attack.

The statement is presented below:

In our quest to keep the general public informed with on-going development regarding the clearing of the incident site (recovery of the rolling stock, repairs of the track) and status of Passengers that were on-board the AK 9 train of Monday 28th March 2022, the Corporation hereby provide the following  updates as at end of work today 3rd April, 2022:

  • Two (2No.) Coaches (SP 00016 and SP 00017) earlier re-railed were safely moved to Rigasa Station. This brings the total number of recovered Coaches and safely moved to NRC Stations to 7No.
  • Intensive work continues on track repairs. More concrete Sleepers were moved to site while some section of twisted tracks has been straightened.
  • Of the 362 validated passengers on board the attacked AK9 train service on 28th April 2022,
    • 186 persons on the manifest are confirmed to be safe and at their various homes (Additional 14 persons confirmed safe today).
    • 51 phone numbers on the manifest are either switched off or not reachable since Tuesday morning.
    • 35 phone numbers on the manifest are ringing but no response from the other end.
    • 60 phone numbers on the manifest when called response non-existent.
    • 22 persons are reported missing by their relatives.
    • 8 persons confirmed dead.

We remain grateful to the Security Agencies for all the support. We are very appreciative of the Squadron Commander MOPOL 1 Kaduna visit to the accident site today. The NRC will continue to update the general public of developments to prevent misleading information and falsehood.

Thank you and God bless Nigeria.

 

Railway

Railway track vandalism: Urgent need for laws prohibiting scrap/metal picking to protect critical assets 

Published

on

Railway track vandalism: Urgent need for laws prohibiting scrap/metal picking to protect critical assets 

By Onyedikachi Stanley Onovo

The wanton destruction and theft of Nigeria’s railway infrastructure and other critical public assets represent one of the gravest threats to national development and security.

Across the nation—from the Warri-Itakpe line to Abuja-Kaduna, the Eastern and Western Districts, Lagos-Ibadan, and throughout the Northern network—vandals systematically dismantle tracks, steal armoured cables, and pillage essential equipment. This crisis demands an immediate and robust legislative response.

The unending menace

The vandalism is perpetrated by a network of individuals, from local miscreants (“iron condemn”) to organised merchants who purchase and export stolen materials. Security reports and countless arrests underscore the scale of the problem:

In December 2023, a private security firm arrested 13 suspects for vandalising Abuja Mass Transit Rail assets. The suspects were said to be casual workers engaged by a Chinese company working on the railways, but said to have used the opportunity to steal the materials.

On June 2024, The Cable reported that the Nigerian Army arrested 47 suspected rail track vandals in Kaduna State.

In October 2025, police arrested a suspect vandalising railway electrical installations also in Kaduna State.

Radio Nigeria in December 2025 announced the arrest of three persons in Kwara State for vandalizing and stealing Railway clips and nuts in Offa.

In May 2021, TVC reported some individuals, including one Ejike Okeke were apprehended in Enugu with stolen sleepers and tracks.

On the 30th of January 2026 the Nigerian Television Authority reported that the NSCDC, Bauchi State Command arrested five suspects and intercepted a truck carrying vandalized railway tracks.

This relentless assault has plagued successive management of the Nigerian Railway Corporation (NRC), defying conventional counter-strategies.

A transformative leadership initiative

A pivotal shift began under the administration of President Bola Ahmed Tinubu with the appointment of Dr. Kayode Opeifa as Managing Director/CEO of the NRC.

Dr. Opeifa introduced a fundamental paradigm shift by redesignating what was carelessly termed “scrap” as “unserviceable critical national assets.”

This reframing has driven a transformative partnership with experts to manage these assets responsibly. The era of controversial public auctions—which often saw valuable national iron assets disappear, depriving Nigeria of materials for repurposing and industrialisation—is now over.

Today, a systematic process ensures these materials are reused or responsibly processed, with revenue reinvested into the Corporation. This home-grown solution is a commendable breakthrough that proves Nigerians can effectively solve national challenges.

The critical legislative gap: Targeting the market

While the NRC’s internal reforms are laudable, they alone cannot stem the tide. The root enabler of this vandalism is the thriving, unregulated market for stolen metal. To kill the vandal’s incentive, we must eradicate the demand.

Therefore, there is an urgent need for the National Assembly to enact legislation that:

1. Prohibits the buying and selling of any railway materials (serviceable or unserviceable) on the open market.

2. Imposes severe penalties on buyers and merchants of vandalised public assets, effectively targeting the economic drivers of this crime.

3. Mandates stringent federal regulation of all scrap metal dealers nationwide.

THE SCRAP DEALER NEXUS

The opaque operations of scrap dealers are a major concern. Their compounds are often shrouded, hiding the provenance of their materials. This unregulated space fuels not only railway vandalism but also community theft—from iron crossing bars in homes to street lamp holders.

Trailers loaded with questionable materials move freely from cities and expressways to unknown destinations. Without regulating this sector, our fight against vandalism remains superficial.

CONCLUSION

The partnership and innovation under Dr. Opeifa’s leadership at the NRC demonstrate what is possible with commitment and vision.

However, to secure our railways, power installations, and other critical assets, we must complement this institutional resolve with strong, deterrence-based law. Legislation that dismantles the market for stolen public property is not an option; it is a national imperative for Nigeria’s security and industrial future.

*Onyedikachi Stanley Onovo, Ph.D

FCAI, ANIPR

onyedikachionovo1@gmail.com excellentdikachi@yahoo.com

Continue Reading

Entertainment

NRC, Entertainers Finalise Plans for 2026 Valentine Train Ride

Published

on

Nigerian Railway Corporation (NRC)

NRC, Entertainers Finalise Plans for 2026 Valentine Train Ride

A team of leading Nigerian artistes and entertainment executives has paid a courtesy visit to the Managing Director of the Nigerian Railway Corporation (NRC), Kayode Opeifa, ahead of the 2026 Valentine Love Train experience.

The delegation included celebrated musician Sunny Neji, Managing Director of Ojez Entertainment Limited, Joseph Odobeatu, and veteran vocalist Yinka Davies.

The high-profile visit formed part of final preparations for the Valentine-themed train ride scheduled for Saturday, February 14, 2026, at the Mobolaji Johnson Train Station.

Dr. Opeifa received the artistes and commended the creative industry for choosing the national rail system as the venue for the annual Valentine event. He noted that the partnership reflects growing public confidence in the corporation’s safety standards, operational improvements, and renewed focus on customer experience.

READ ALSO:

“The 2026 edition aims to deliver an unforgettable experience while deepening public engagement with the rail service,” Opeifa said, reaffirming the NRC’s commitment to providing secure and efficient transport for passengers during special events.

Organisers disclosed that this year’s edition will feature an expanded entertainment lineup, including performances and appearances by Charles Inojie, Yinka Davies, Sunny Neji, and Segun Arinze. Guests are expected to enjoy live music, comedy, a couple’s game show, fashion showcases, and special performances throughout the Lagos–Ibadan–Lagos train ride, culminating in a Valentine banquet ball.

The Valentine Love Train has in recent years become a fixture on the NRC’s festive calendar, attracting couples, families, and leisure seekers with its blend of travel, romance, and entertainment. The initiative also aligns with ongoing efforts by the corporation to promote rail transportation as a viable and enjoyable alternative for intercity travel.

With final logistics being fine-tuned, organisers say the 2026 edition promises to combine safety, comfort, and premium entertainment for participants.

NRC, Entertainers Finalise Plans for 2026 Valentine Train Ride

Continue Reading

Railway

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

Published

on

Kano-Maradi railway

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

The Lagos State Government has taken steps to address persistent flooding within the Ebute-Meta railway corridor and adjoining communities with the construction of a major stormwater drainage channel in collaboration with the Nigerian Railway Corporation.

The NRC said the state government had awarded a contract for the construction of the Carter-Railway Channel, also known as System 4, aimed at deflooding the railway compound as well as parts of Olaleye and neighbouring areas within Lagos Mainland Local Government Area.

The reinforced concrete drainage channel will run from Murtala Muhammed Way in Ebute-Meta through the railway corridor to a discharge point at Iponri on Western Avenue.

Speaking at a stakeholders’ meeting held at the railway premises, the Director of Drainage Services at the Lagos State Ministry of Environment and Water Resources, Engr.

READ ALSO:

Adedapo Ajadi, said the project would permanently address the perennial flooding that has affected residents, institutions and businesses in the area for years. He added that construction work is expected to last about 18 months and urged stakeholders to cooperate with contractors to ensure smooth execution.

Stakeholders at the meeting included representatives of St Saviour’s School, NTA Channel 10, the Railway Museum, Federal Medical Centre Ebute-Meta, CCECC quarters, churches, mosques, as well as industrial and small business operators within the railway corridor.

Managing Director of the Nigerian Railway Corporation, Dr Kayode Opeifa, described the intervention as timely, assuring that the corporation would give full support to the multi-billion-naira project.

He noted that the infrastructure, when completed, would significantly reduce flooding and improve safety within the railway environment and neighbouring communities.

Some stakeholders welcomed the development, saying annual flooding had disrupted academic, medical and commercial activities in the area and posed risks to lives and property.

Officials of the Lagos State Government and the NRC later carried out a joint inspection of the proposed corridor to assess the alignment and identify areas that may be affected before construction begins.

 

LASG Moves to End Years of Flooding in Ebute-Meta Railway Corridor

Continue Reading
HostArmada Affordable Cloud SSD Shared Hosting
HostArmada - Affordable Cloud SSD Web Hosting

Trending