Air Peace gets court order to answer queries on aircraft operations – Newstrends
Connect with us

Aviation

Air Peace gets court order to answer queries on aircraft operations

Published

on

Air Peace gets court order to answer queries on aircraft operations

A Lagos State High Court has ordered Air Peace to respond to questions brought by the Foundation for Investigative Journalism in a libel suit No. LD/ADR/4833/23 filed by the airline on October 12, 2022, regarding its aircraft operations from Lagos to Anambra State.

Air Peace insisted that it followed safety standards and practices in accordance with relevant regulations and policies.

It questioned the FIJ’s interrogations of its aircraft and flight operations, calling them “scandalous and irrelevant” to the libel case.

FIJ was dissatisfied with Air Peace’s responses to the queries and filed an application to compel them to adequately explain the objections.

Justice Kudiarat Jose upheld the argument of FIJ, represented by its counsel, Abimbola Ojenike and Jesulayomi Oyelami of Slingstone LP, stating that the questions requesting the details of the first two aircraft designated to convey passengers were relevant to the facts in issue, related to the defendant’s case, and capable of proving that the defendants were correct.

As a result, the court ordered Air Peace to respond to questions 1, 4, and 7 of the defendant’s interrogation within seven days of receiving the order.

The questions are: ‘Provide a comprehensive description and specification of the aircraft 5N-BUL initially scheduled for the operation of Flight P47336 on October 12, 2022. The description should include the make, year, engine type, and service information, including the most recent aircraft maintenance checks conducted prior to Flight P47336 on October 12, 2022, particularly but not limited to any faults or repairs on the systems.’

READ ALSO:

The airline is also to: ‘Provide comprehensive specifications of the technical issues discovered in the course of operation of Flight P47336 and the circumstances that led to the change of the aircraft from 5N-BUL to 5N-BQQ.’

The court also ordered the airline to: ‘Provide the comprehensive descriptions and specifications of the aircraft 5N-BQQ initially onboard the passengers for the operation of Flight P47336 on October 12, 2022.

‘The description should include make, year, engine type, and service information, including the most recent aircraft maintenance checks conducted prior to Flight P47336 on October 12, 2022, particularly but not limited to any faults or repairs on the systems.

The claim was deferred until May 23, 2024, for additional proceedings.

In October 2022, FIJ stated that passengers on an Air Peace flight from Lagos to Anambra escaped death after the engine failed three times at the takeoff point.

According to FIJ, the aircraft was supposed to take off at 11 a.m. but was delayed for two hours when the airline’s management announced that the jet originally booked for the Anambra flight had suddenly acquired an issue.

“The engine stopped three times, and there was no explanation until passengers asked to be allowed to leave the plane. The captain only gave a vague explanation when the passengers expressed their concerns. He said the DAC or something similar to that went off on us,” FIJ had quoted one of three sources as saying.

“This was supposed to be a substitute plane as the first couldn’t be used for technical reasons. If this lackadaisical attitude continues, I fear they may record a crash soon. If we had flown today, we likely would have crashed.”

Air Peace then filed legal action against FIJ, seeking N50 million in damages, N250 million in aggravated damages, and N5 million in legal fees.

Air Peace gets court order to answer queries on aircraft operations

Aviation

Nigeria’s rail revenue drops 4% to N2.2bn in three months

Published

on

Nigeria’s rail revenue drops 4% to N2.2bn in three months

Revenue generated from rail transport fell by 4.7 percent year-on-year (YoY) to N2.19 billion in the third quarter of 2024 (Q3’24), from N2.3 billion in the corresponding period of 2023, Q3’23.

The National Bureau of Statistics, NBS, disclosed this yesterday in its Rail Transportation Data for Q3’24.

The breakdown of the revenue shows N1.7 billion was received from passengers while N412.57 million was collected on goods/cargo, and N51.85 million received from the movement of goods/cargo through pipelines. It also generated N34.77 million from income line categorized as ‘Other Receipts’.

READ ALSO:

The Bureau also said that 743,205 passengers travelled through the rail system during the period.

It stated: “In Q3’24, a total of 743,205 passengers travelled via rail system relative to 594,348 reported in the corresponding quarter of 2023, indicating a growth rate of 25.05 percent.

“The volume of goods/cargo transported via rail in Q3 2024 stood at 96,401 tons compared to 69,003 tons recorded in Q3 2023.

“In the quarter under review, the Nigerian Railway Corporation (NRC) reported an additional volume of goods/cargo transported via pipeline which stood at 7,320 tons, lower than 12,960 tons in Q3 2023.

“In terms of revenue generation, N1.7 billion was received from passengers during the reference period, showing an increase of 13.83 percent from the N1.49 billion recorded in the same quarter of the previous year”.

Nigeria’s rail revenue drops 4% to N2.2bn in three months

Continue Reading

Aviation

JUST IN: Six crew members escape unhurt as Cargo plane crash-lands in Abuja

Published

on

JUST IN: Six crew members escape unhurt as Cargo plane crash-lands in Abuja

A cargo plane operated by Allied Air made an emergency landing at Abuja’s Nnamdi Azikiwe International Airport due to a malfunctioning landing gear.

The aircraft, bearing registration number 5N-JRT, experienced the failure on Wednesday at 10:00 am with six crew members on board.

“Fortunately, no casualties were recorded,” a source familiar with the incident said.

“Crew members were quickly evacuated and are undergoing medical evaluations at the 063 Nigerian Air Force medical unit.”

READ ALSO:

“Emergency responders swiftly secured the crash site, cordoning off the area under Military Airport Commandant supervision.”

The source revealed that the airport’s runway is temporarily closed, causing flight delays.

Airport authorities, including the Nigerian Civil Aviation Authority, are working to remove the aircraft and inspect the runway for potential damage.

This incident occurs three months after a Port Harcourt helicopter crash claimed three lives.

JUST IN: Six crew members escape unhurt as Cargo plane crash-lands in Abuja

Continue Reading

Aviation

FG stops Adeleke’s move to relocate Osun Airport to Ede

Published

on

Governor Ademola Adeleke

FG stops Adeleke’s move to relocate Osun Airport to Ede

The federal government has suspended the relocation of the Osun State International Airport project from Ido-Osun to Ede, following widespread controversies and protests.

Governor Ademola Adeleke had announced that the foundation-laying ceremony for the new airport would be held on December 16, 2024, in Ede, his hometown.

The event was to feature key dignitaries, including Ministers of Works and Aviation, David Umahi and Festus Keyamo.

However, the proposed relocation drew sharp criticism.

The Ido-Osun community staged protests, condemning the move as nepotistic and undemocratic.

Critics argued that the relocation prioritised personal interest over public good.

In defence, the Osun state government cited encroachment on the Ido-Osun airport land, the presence of gullies, and the inadequacy of the runway as reasons for the decision.

In a letter dated December 6, 2024, signed by the Permanent Secretary of the Federal Ministry of Aviation and Aerospace, Dr. Emmanuel D. Meribole, and addressed to Governor Adeleke, the ministry directed the state government to suspend the project indefinitely.

READ ALSO:

The letter, obtained exclusively by The Nation, stated: “Re: Invitation as a Special Guest of Honour at the Foundation Laying Ceremony of the Osun State International Airport. I wish to refer to your letter Ref. No. 5.12/19/1/Vol.VI/188 dated 21st November 2024 on the above subject and to respectfully request Your Excellency to suspend the foundation laying ceremony of the Osun State International Airport until the issues regarding the petitions over the existing airstrip/airport are resolved and to harmonize the state’s efforts with that of the federal government.”

This development marks a significant setback for Governor Adeleke’s administration amid ongoing disputes over the airport’s future.

“Your Excellency may wish to note that the airstrip is a federal project that is captured in the Ministry’s 2024 Appropriation. We also note that you have made arrangements to expand the airstrip to an international airport. In addition, there is a petition indicating there is an existing airstrip where funds have been expended and the need to use the site for the present airstrip instead of a new site.

“The federal government is mandated to ensure judicious use of funds to curtail wastage of resources. As this Airstrip Project is a collaboration between state and federal governments, we must be in synch before the project takes off.

“Accordingly, Your Excellency is respectfully requested to reschedule the foundation laying ceremony of the Osun State Airport pending the resolution of the petitions and selection of a mutually agreed date. Please, accept the assurances of the Honourable Minister’s highest regards.”

FG stops Adeleke’s move to relocate Osun Airport to Ede

Continue Reading

Trending