Uncategorized
Plan your trip, FG begins eight-week Eko Bridge shutdown
Plan your trip, FG begins eight-week Eko Bridge shutdown
By Dada Jackson
The Federal Government has shut down the Eko Bridge and Ramps for eight weeks begining from Friday, September 20, 7am.
This is to allow for asphalt-resurfacing work on the road and it is expected to be completed and reopened on November 20, 2024.
This is contained in a statement signed by the Federal Controller of Works for Lagos, Engr. Olukorede Kesha.
She stated, “The closure will be full at some sections of the bridge and partial at other sections.
“This critical project aims to improve road safety and enhance the driving experience of motorists.
“The work involves milling of the existing asphalt and relaying new asphalt on the bridge and ramps. This will address wear and tear and ensure a smoother, safer roadway.”
Alternative routes are advised to be used by motorists during the period of closure.
For those heading for the Island coming from Funsho Williams Avenue, they can use the service lane at Alaka to connect Costain and access the Eko Bridge and link Apongbon.
The travel advisory offered includes: “Costain inwards Alaka/Funsho Williams Avenue: Pass through Apapa Road from Costain and link Oyingbo to access Adekunle then link to the Third Mainland Bridge
“Surulere: Use Costain to link Breweries inwards the Abebe Village to connect Eric Moore/Bode Thomas.”
The government urged residents and businesses within the closure zone to plan their movements accordingly.
It also said, “Appropriate signage and traffic control measures will be in place to guide drivers and pedestrians.
“We apologize for any inconvenience this may cause and appreciate the public’s patience and cooperation as we work to improve our infrastructure.”
Uncategorized
BREAKING: Adeleke finally pardons ‘fowl thief’ Segun Olowookere
BREAKING: Adeleke Finally Pardons ‘Fowl Thief’ Segun Olowookere
Governor Ademola Adeleke of Osun State has granted the prerogative of mercy to Segun Olowookere, a young man convicted of armed robbery and sentenced to death by an Ogun State High Court in 2014.
READ ALSO:
- Five Gaza journalists die in Israeli strike
- Mozambique: Over 1,000 prisoners escape jail as election protests worsen
- Bandit leader Bello Turji threatens reprisals over arrest of close associate
Olowookere was pardoned alongside Sunday Morakinyo and 51 others convicted of simple and serious offences on Thursday.
Uncategorized
Lagos-Calabar coastal road: Train track work begins 2025, says minister
Lagos-Calabar coastal road: Train track work begins 2025, says minister
The Federal Government plans to begin constructing train tracks on Section I of the Lagos-Calabar Coastal Highway in 2025.
The Minister of Works, David Umahi, made this announcement during an inspection of Sections I and II of the project, which are located within Lagos and being handled by Hitech Construction Company Ltd, on Friday, December 20, 2024.
The details of the announcement were published in a statement on the ministry’s official website on Saturday.
READ ALSO:
- Three days to Christmas, food prices, transport fares hit the roof
- Three Ogun varsity students die auto crash
- Dangote, MRS agree to sell petrol at N935/litre nationwide
“The President has given very serious attention to road infrastructure. Don’t forget that this Coastal Highway and, of course, the four Legacy Projects all have the train track incorporated. The construction of the train track for this section I is going to take off in 2025,” Umahi stated.
The Works Minister outlined plans to enhance the Lagos-Calabar Highway in Sections I and II of Phase 1, including solar-powered CCTV cameras, lay-bys every 5-15 kilometers, and security posts for improved safety and monitoring.
He announced that 20 kilometers of Section 1 are scheduled for commissioning by May 2025. The Federal Controller of Works, Engr. Olukorede Kashia, noted challenges such as large refuse dumps and unsuitable soil conditions requiring extensive remediation during the project.
Lagos-Calabar coastal road: Train track work begins 2025, says minister
Entertainment
Copyright: Court orders Adele’s song removed from platforms
Copyright: Court orders Adele’s song removed from platforms
A Brazilian court has ordered the removal of Adele’s 2015 song Million Years Ago from radio and streaming platforms worldwide following a copyright lawsuit filed by local composer Toninho Geraes.
The ruling, delivered by Judge Victor Torres, comes after Geraes accused the British singer of copying his 1996 classic Mulheres, originally performed by Brazilian artist Martinho da Vila.
READ ALSO:
- Ibadan, Abuja, Anambra stampedes: IG orders probe, threatens prosecution of organisers
- Gabriel Jesus shines as Arsenal thrash Palace 5-1 in London derby
- Atletico grab late winner at Barcelona to go top of La Liga
Geraes claims the track from Adele’s album 25 closely mirrors his 1995 composition, demanding recognition and compensation for the alleged infringement.
In the lawsuit, Geraes is seeking $160,000 in moral damages, lost royalties, and a songwriting credit on Adele’s track.
The court has also imposed a fine of $8,000 per act of non-compliance on the Brazilian subsidiaries of Sony Music and Universal Music Group.
Copyright: Court orders Adele’s song removed from platforms
-
metro3 days ago
INTERPOL declares 14 Nigerians wanted for drug, human trafficking
-
Business3 days ago
NNPCL launches production monitoring centre
-
Business2 days ago
Be creative, monarch, others challenge Muslim professionals on economic revival
-
metro2 days ago
Jigawa State governor loses son 24 hours after mother’s death
-
metro3 days ago
Ibadan stampede: She was treated like a terrorist, Queen Naomi’s sister says about her condition
-
Entertainment1 day ago
MultiChoice announces free access to all DSTV channels for 3 days
-
Auto23 hours ago
LSM MD extols founder’s qualities after latter posthumous industry award
-
metro21 hours ago
Heavy security in Ilesa as ex-Osun deputy gov emerges new Owa-Obokun