Updated: Rail track vandals risk life imprisonment, says NRC – Newstrends
Connect with us

Railway

Updated: Rail track vandals risk life imprisonment, says NRC

Published

on

Vandalisation and stealing of railway materials especially track equipment could attract life imprisonment upon conviction of the suspects who will face a manslaughter charge.
The Nigerian Railway Corporation stated this on Sunday, saying this was part of new measures being taken to arrest the disturbing new practice of cutting and stealing rail track materials as more standard gauge trains commence operation.
Coordinator of the Warri-Itakpe rail line operation, Abdulganniyu Saani, an engineer, who stated this in a telephone interview with NewsTrends, also dismissed the viral video of the arrest of five suspects with a vehicle load of rail track sleepers, which were claimed to have been cut from the new rail line.
He said it was an old clip of an incident captured many years ago with the suspects who had stolen some of the narrow-gauge rail sleepers around Jos, Plateau State.
He said the police had begun a manhunt for the vandals of the Warri-Itakpe extra rail line located in a station within Kogi State, who were still on the run.
Sanni explained that the activities of rail track vandals could “lead to derailment and death of innocent train passengers, adding that all hands must be on deck to stamp out such criminal act.
“It is not just about the cost of replacing or fixing the damaged or stolen materials but the danger this poses to the lives of innocent people using the facility.”
He said the corporation had elicited the support of leaders of communities where the rail track passes through and they had agreed to set up vigilante groups for continued surveillance and protection of the rail materials.
“One of the reasons we give priority to the employment of locals, that is members of communities where our track passes through, is to get their cooperation of always protecting our facilities.” Sanni stated.
He also said the latest cutting of Warri-Itakpe track material was not on the main lane but an extra lane, which had not disrupted the running of freight and passenger trains.
He said, “The train has continued to run; no day has been skipped. Our main line is not affected.
“But the police in Kogi State where the incident had happened are on the red alert. They are working with other security agencies to apprehend the vandals and anybody who dares tamper with railway materials.”

Railway

Finally, Port Harcourt-Aba train service begins with four-day free ride

Published

on

Finally, Port Harcourt-Aba train service begins with four-day free ride

A four-day free train ride from Port Harcourt in Rivers State to Aba, Abia State will begin today, May 1, signifying commencement of rail service along the 62-kilometre route.
This is coming a month after the train operation on the rehabilitated narrow gauge track was initially meant to start.
Minister of Transportation, Senator Saidu Alkali, inaugurated the rail service in Port Harcourt on Tuesday.

Alkali said the project was part of the rehabilitation of 1,443km Port Harcourt to Maiduguri narrow gauge rail line.

He said that the Port Harcourt to Aba section of the project was the initial part of the Eastern narrow-gauge railway, aiming to connect five geopolitical zones of the country.

He said, “The Federal Government is pleased to inaugurate the train service from Port Harcourt to Aba, a key priority area of President Bola Tinubu’s administration.
“We are grateful to God for the completion of the Port Harcourt to Aba section, which will bring succour to the people.
“The Eastern narrow gauge covers five geo-political zones of the country, including South-South, South-East, North-Central, North- West, and North-East,” he said.
Aba to Enugu rail is next
Alkali said following the completion of the first segment and the start of commercial operations of the rail service, the Federal Government would soon commence the construction of the Aba to Enugu rail project, linking the two states together.
He added that his ministry was working with investors to ensure the conversion of the locomotive across the country from diesel to Compressed Natural Gas (CNG) to reduce transportation costs further.
“Shortly, we will take a train ride from Port Harcourt to Aba, which means that from today, passenger train service has commenced.
“We will continue the project from Aba to Enugu and from Port Harcourt to both Onne and Port Harcourt seaports for freight services.
“The ministry is currently in discussion with an investor to convert our locomotive from diesel to Compressed Natural Gas (CNG) to reduce transportation costs further,” he said.
The minister assured Nigerians that arrangements were being made with security agencies to ensure adequate security along the rail routes.
He also announced free train rides from Port Harcourt to Aba between May 1 to May 4.
“The train will depart from Port Harcourt to Aba at 8am daily, while it will leave Aba to Port Harcourt at 3pm daily.
“Full commercial operations will resume on May 7, 2024,” he said.

Continue Reading

Railway

Our medical team tried to rescue policeman who died on Abuja-Kaduna train – NRC 

Published

on

Our medical team tried to rescue policeman who died on Abuja-Kaduna train – NRC 

 

The Nigerian Railway Corporation has reacted to the death of policemen while on escort duty aboard the Abuja-Kaduna train on April 5, saying the deceased received medical attention on the train.

It said this in a statement on Tuesday.

The police escort attached to the train was said to have died on the train conveying passengers from Kaduna to Abuja last Thursday.

The police officer reportedly complained of chest pain before he collapsed and died.

Some have accused the NRC of not having medical personnel on board.

But the NRC said there was a medical doctor on duty on the train when the incident happened.

It disclosed that the official was also assisted by a passenger, also a medical practitioner.

The statement read in part, “The NRC management wishes to emphatically inform the general public that we have well trained medical personnel and equipped medical cubicle to attend to any emergency health challenges of our esteemed passengers.

“For the avoidance of doubt, the medical personnel on duty was Mariam Abdulai who was assisted by a good Samaritan medical practitioner that happens to be our passenger on board to revive the ailing cop but was in futility.

“The management of the NRC expresses its heartfelt condolence to the bereaved family of the late police inspector, Nambut Selbol, who was escort on duty in Abuja – Kaduna train service on that fateful day.”

Continue Reading

Railway

Abuja metro rail 97% ready, says Wike after 30-minute ride

Published

on

Wike in 30-min ride on Abuja metro train, says it’s 97% ready

Minister of the Federal Capital Territory (FCT), Nyesom Wike, on Friday undertook a 30-minute ride on the Abuja metro train after an inspection of the intra-city rail project.

The train ride was done after an inspection tour from the Metro Station in Central Area to the Nnamdi Azikiwe International Airport, Abuja.

He disclosed that the Rail Mass Transit (ART) project was 97 per cent ready.

Wike President Bola Tinubu would be happy to commission the Abuja Rail Mass Transit project in May.

The minister described the development as a “dream comes true”.

He said the project would be ready for inauguration to celebrate Tinubu’s one year in office.

Wike said Tinubu had approved the schedule for the inauguration of projects in the FCT.

The minister said, “We are very happy. We are almost 97 per cent completed. All works are ongoing to make sure that the May delivery date is a reality.

“I believe this is one of the projects Mr President would like to inaugurate, because it is very key to the development of the economy.

“For me, it is a dream come true, and we are happy that after all said and done, the metro line will be put to use for Nigerians, come May 29″.

After the test ride from the Metro Station to the Airport, the minister declared that it would be more convenient to use the train than vehicles to go to the airport.

He added, “I am really impressed with the contractor, China Civil Engineering Construction Corporation (CCECC).

“The company has assured us that all the renovation works on the stations will be ready before the commissioning date.”

Continue Reading

Trending

Skip to content