Amaechi: Buhari to flag off eastern rail project March 9 - Newstrends
Connect with us

Railway

Amaechi: Buhari to flag off eastern rail project March 9

Published

on

President Muhammadu Buhari will perform the groundbreaking ceremony for the eastern rail corridor of the country’s ongoing railway modernisation on March 9, 2021, Minister of Transportation, Rotimi Chibuike Amaechi.

Ameachi stated this on Saturday during his inspection of all the stations along the new Lagos-Ibadan rail line from Ebuta Metta to Ibadan.

The minister, in a statement on Sunday in Abuja by the Director of Press of the ministry, Mr Eric Ejiekwe, said the President had also approved the redirecting of the eastern line to two new spurs, namely: Abakaliki, Ebonyi State and Awka, Anambra State.

Amaechi said the Federal Government had approved the commencement of the Port Harcourt – Kano rail project and was also negotiating loans for the Lagos – Calabar rail project.

On the commencement of the Ibadan-Kano rail project, the minister said the government was still seeking approval for a loan for the work.

Speaking on the Lagos-Ibadan rail project, Amaechi said that he had urged the contractor, China Civil Engineering and Construction Company (CCECC), to deploy global acceptable safety and security standards for the work.

He directed that central cooling system be installed in all the major train stations along the route.

In a separate development, the minister has instructed the Nigerian Ports Authority (NPA) to punish truckers who flout government’s directives, especially when the rail end of the Apapa Port spur line is completed

He added that President Buhari had issued a directive on the tonnage of cargo that should be allowed on roads and would be strictly complied with.

According to him, the directive has not been implemented as there are no viable alternatives yet.

The statement further said that during the inspection, the minister took the train to the completed southward 8.72km of the Apapa Port Spur Line end of the Lagos-Ibadan rail line.

He expressed displeasure at the high number of trucks parked on the rail track, making work difficult to complete.

The minister, therefore, directed the management of the NPA to ensure that the trucks were moved out, adding that only registered trucks moving goods imported or to be exported would be allowed into the ports.

Railway

Eid-el-Fitr: NRC to Operate Three Lagos–Ibadan Train Trips on March 23

Published

on

Nigeria Railway Corporation (NRC)

Eid-el-Fitr: NRC to Operate Three Lagos–Ibadan Train Trips on March 23

The Nigeria Railway Corporation (NRC) has announced the operation of three scheduled train trips on the Lagos–Ibadan Train Service (LITS) corridor on Monday, March 23, in response to increased passenger demand during the Eid-el-Fitr travel period.

The announcement was made in a statement by NRC spokesperson Callistus Unyimadu, who explained that the additional services are intended to ease passenger movement, reduce congestion, and provide more travel options for commuters returning after the festive celebrations. He noted that the Lagos–Ibadan rail route, connecting Lagos and Ibadan, remains one of the busiest rail corridors in the country, particularly during public holidays when road traffic is usually heavy.

According to the NRC, departures from Lagos will take place at the Mobolaji Johnson Train Station at 7:45 a.m., 1:40 p.m., and 4:00 p.m. From Ibadan, trains will depart from the Obafemi Awolowo Train Station at 8:00 a.m., 10:50 a.m., and 4:30 p.m. The corporation said the schedule was designed to improve travel flexibility, enhance rail transport convenience, and accommodate the surge in passenger turnout typically recorded during festive periods.

READ ALSO:

Unyimadu reaffirmed the corporation’s commitment to delivering safe, reliable, and efficient rail services, noting that operational adjustments are often made during peak travel seasons to meet growing demand. He advised passengers to arrive early at train stations, comply with ticketing and security procedures, and plan their journeys in advance to avoid delays or inconvenience.

The NRC also appreciated passengers for their continued patronage and cooperation, describing it as essential to maintaining smooth operations across its services. The introduction of additional train trips is part of broader efforts to support intercity mobility during high-demand periods such as Eid-el-Fitr, when large numbers of Nigerians travel between major cities.

Rail services along the Lagos–Ibadan corridor have increasingly become a preferred alternative to road transport due to their relative speed, safety, and reduced exposure to highway congestion. Transport authorities continue to encourage the use of rail infrastructure as part of efforts to improve public transportation efficiency and ease pressure on Nigeria’s road networks during festive seasons.

Eid-el-Fitr: NRC to Operate Three Lagos–Ibadan Train Trips on March 23

Continue Reading

Railway

NRC announces free train rides, extra trips for Eid Fitr 

Published

on

NRC announces free train rides, extra trips for Sallah special 

 

Getting home for the holidays just got a whole lot easier as the Nigerian Railway Corporation (NRC) has rolled out its special Sallah train schedule, deploying extra trips and increasing capacity to ensure Nigerians can celebrate Eid-el-Fitr with their loved ones without the usual travel stress.

From the bustling Lagos-Ibadan corridor to the scenic Warri-Itakpe route, the NRC is stepping up its game to handle the festive surge.

Its key highlights of the Sallah schedule as contained in its latest statement are as follows:

* Lagos–Ibadan (LITS): On Thursday, March 19, the service will run three special trips.

* From Lagos: 7:40 a.m., 1:40 p.m., and 4:00 p.m.

* From Ibadan: 8:00 a.m., 10:50 a.m., and 4:30 p.m.

* Abuja–Kaduna (AKTS): To keep the capital connected, the NRC is boosting frequency. After two trips on Thursday, the corridor will move to three trips daily from Friday, March 20, through Monday, March 23.

* Warri–Itakpe (WITS): This route maintains its thrice-weekly flow.

* Warri to Itakpe: Sundays, Tuesdays, and Fridays (8:00 a.m.).

* Itakpe to Warri: Mondays, Wednesdays, and Saturdays (12:00 p.m.).

* Eastern Narrow Gauge: The Port Harcourt–Aba service remains fully operational on its regular schedule, ensuring the South-East stays moving.

These details are contained in a statement signed by the NRC Chief Public Relations Officer, Callistus Unyimadu.

Osun free rides

In a heart-warming partnership, the NRC and the Osun State Government are bringing back the Imole Special Train.

Indigenes of Osun State can travel from Iddo Station in Lagos to Osogbo free of charge. This initiative, fully sponsored by the state, aims to ease the financial burden on families during the festive season.

“This special arrangement is designed to accommodate increased passenger traffic… ensuring a safe, reliable, and efficient rail transport service,” stated Callistus Unyimadu, NRC’s Chief Public Relations Officer.

Tips for travellers 

To ensure your trip is as smooth as the tracks, the NRC recommends:

* Arrive Early: Be at the station well ahead of your departure time.

* Verify Tickets: Ensure you follow all official ticketing and security protocols.

* Check the Date: Remember that the Lagos-Ibadan special three-trip schedule is for March 19 only before reverting to normal service.

Continue Reading

Railway

BREAKING: Several Passengers Injured as Abuja–Kaduna Train Derails After Collision

Published

on

File photo

BREAKING: Several Passengers Injured as Abuja–Kaduna Train Derails After Collisio

Several passengers were injured on Monday after a train travelling along the Abuja–Kaduna rail corridor derailed following a collision, authorities have confirmed.

The incident reportedly occurred near Asham along the busy rail line linking Abuja with Kaduna State, causing panic among passengers onboard the train.

The Managing Director of the Nigerian Railway Corporation (NRC), Kayode Opeifa, confirmed the development, stating that emergency response teams were immediately deployed to the scene following the derailment.

According to preliminary reports, the train derailed after colliding with another object on the track, though officials have yet to disclose full details about the circumstances surrounding the accident.

READ ALSO:

Several passengers sustained injuries during the incident and were evacuated to the medical facility at the Idu Railway Station for treatment. Authorities, however, said no fatalities had been recorded as of the time of filing this report.

Eyewitness accounts and videos circulating on social media showed damaged train coaches and railway personnel assessing the situation while stranded passengers gathered near the tracks after disembarking from the train.

The Abuja–Kaduna rail corridor is one of Nigeria’s busiest passenger routes and serves thousands of commuters daily, particularly travellers seeking a safer alternative to road transportation.

Officials of the Nigerian Railway Corporation said investigations have commenced to determine the exact cause of the collision and derailment.

More details are expected as authorities continue rescue operations and assess the extent of the damage.

BREAKING: Several Passengers Injured as Abuja–Kaduna Train Derails After Collision

Continue Reading
HostArmada Affordable Cloud SSD Shared Hosting
HostArmada - Affordable Cloud SSD Web Hosting

Trending