Railway
Abuja light train moved 250,000 passengers in 100 days – CCECC
Abuja light train moved 250,000 passengers in 100 days – CCECC
The Abuja Light Rail system moved over 250,000 passengers in over 100 days since commercial passenger operations commenced.
An official of the China Civil Engineering Construction Corporation (CCECC), John Zhao, disclosed this in a post on X Friday.
The rail system featuring two lines with a total length of 45km was developed and is currently operated CCECC.
According to Zhao, the rail network consists of 12 stations, connecting key areas such as the Abuja city centre, Nnamdi Azikiwe International Airport, the main railway line, and Kubwa satellite town.
“During its operation, over 250,000 passengers have already been served,” he stated.
“The Phase I of the Abuja Rail Mass Transit by CCECC has been operating safely for over 100 days.
“Consisting of 2 lines with a total length of 45 km and 12 stations, the maximum operating speed of the trains can reach 100 km/h.
“It connects Abuja city centre, the international airport, rail line, and Kubwa satellite town.”
The post further noted that since the Abuja light rail commenced passenger operations, it had significantly reduced traffic jam in the Federal Capital City.
In May 2024, passenger operations were launched on Phase 1 of the rail line, with CCECC currently operating the line.
President Bola Tinubu introduced a two-month free ride service, which was later extended to the end of 2024, significantly boosting public interest and use of the rail system.
The Abuja Rail Mass Transit, constructed by China Civil Engineering Construction Company (CCECC) and inaugurated in 2018 during the administration of former President Muhammadu Buhari, had faced delay in fully commencing operations due to a lack of essential infrastructure, including access roads.
The challenges, along with disruptions caused by the COVID-19 lockdown, led to the project being temporarily halted. To address these issues, several budget allocations were made.
In August 2023, the Federal Capital Territory Administration (FCTA) awarded a N5 billion contract to CCECC for the rehabilitation of the Abuja Rail Mass Transit.
Further rehabilitation efforts continued with N29 billion allocated in the 2024 Federal Capital Territory statutory budget to support the project.
The original construction of the project cost $823 million.
Railway
Lagos Rail Mass Transit part of FG free train ride – NRC
Lagos Rail Mass Transit part of FG free train ride – NRC
The Nigerian Railway Corporation (NRC) has disclosed that the Lagos Rail Mass Transit (LRMT) trains are included in the Federal Government’s free train ride initiative for the Christmas and New Year celebrations.
The LRMT, which currently includes the Phase 1 Blue Line Rail and the Phase 1 of the Red Line Rail, operates under the Lagos Metropolitan Area Transport Authority (LAMATA).
This announcement was made by Ben Iloanusi, the Acting Managing Director of the NRC, during an interview on NTA News TV on Friday, following the launch of the initiative earlier that day.
While Iloanusi stated that Phase 1 of both the Blue Line and Red Line Rail projects are part of the program, LAMATA has yet to confirm this inclusion.
READ ALSO:
- Nigeria denies alleged plot to destabilise Niger Republic
- Navy arrests 19 Nigerians attempting to reach Europe by hiding on ship
- Troops arrest four Ambazonian rebels in Taraba
Iloanusi outlined the other routes benefiting from the scheme, which include the Lagos-Ibadan Train Service, Kaduna-Abuja Train Service, Warri-Itakpe Train Service, Port Harcourt-Aba Train Service, and the Bola Ahmed Tinubu Mass Transit in Lagos. Notably, little was previously known about the Bola Ahmed Tinubu Mass Transit service until this disclosure.
“Let me mention the routes where this free train service is happening. We have the Lagos-Ibadan Train Service, we have the Kaduna-Abuja Train Service, we have the Warri-Itakpe Train Service, we have the Lagos Rail Mass Transit trains, we have the Port Harcourt-Aba Train Service, and we have what we call the Bola Ahmed Tinubu Mass Transit, which is also in Lagos,” he stated.
Iloanusi provided operational updates, stating that passengers nationwide can access free tickets online or, for those unable to do so, at train stations where they will be profiled and validated.
He noted that passengers using NRC-managed services (excluding the Lagos Rail Mass Transit) should reserve tickets via the official website, www.nrc.gov.ng, with a valid ID required. He also advised travelers to plan, arrive on time, and bring valid identification.
Lagos Rail Mass Transit part of FG free train ride – NRC
Railway
NRC announces special Xmas, end-of-year train service
NRC announces special Xmas, end-of-year train service
The Nigerian Railway Corporation (NRC) says it will operate an end of the year special train service on all its routes across the country.
It announced this in a statement on Wednesday by its Deputy Director, Public Relations, Yakub Mahmood, saying it was in compliance with the Federal Government’s directive through the Federal Ministry of Transportation.
It however did not indicate if the special train service would be free or not.
The Federal Government last year similarly declared special train services for Christmas and New Year, which were made free for all users.
The statement added the modality for this year’s special service would be released soon.
The latest statement read, “The management of the Nigerian Railway Corporation (NRC), in compliance with the Federal Government’s directive through the Federal Ministry of Transportation, hereby informs the general public that the NRC shall operate end of the year special train services in commemoration of Christmas and New Year celebrations.
“This end-of-the-year special train service on scheduled passenger trains, is part of the government’s gesture towards an enjoyable end of the year celebration.
“Dates and modalities of the end-of-the-year Special Train Service shall be communicated in due course. We wish all our esteemed customers a Merry Christmas and a Happy New Year in advance.”
Railway
FG hands over $3bn Port Harcourt-Aba railway project to NRC
FG hands over $3bn Port Harcourt-Aba railway project to NRC
The 62-kilometre, $3.02 billion Port Harcourt-Aba railway project has been completed by Federal Government and handed over to the Nigerian Railway Corporation (NRC).
The Port Harcourt-Aba section is part of the larger Port Harcourt-Maiduguri eastern narrow gauge railway project, initiated under the administration of President Muhammadu Buhari.
The project supervisor, Federal Ministry of Transportation, Ayo Dada, formally transferred the railway to the NRC during a brief ceremony held on Thursday in Port Harcourt.
He said that the project, completed in May, had significantly improved passenger movement between Rivers and Abia, thereby enhancing their economies.
“The assets handed over include dismantled tracks measuring 283.060 km, rehabilitated and reconstructed 62.800 km of subgrade and the laying of 62.800 km of rail for the main line,” Dada said.
“This includes the laying of rail for sliding lines covering 5.690 km and the reconstruction of 27 sets of turnouts at Port Harcourt, Elelenwo, Obuzor, Umugo and Aba Stations, among others.”
Dada said that with the handover of the Port Harcourt–Aba section, the Federal Government would focus on the Port Harcourt–Maiduguri phase of the project.
READ ALSO:
- Naira appreciates to N1,740/$ in parallel market
- Reform Bills propose 55 per cent VAT revenue for states
- Nigeria ranks 4th among Africa’s most improved visa friendly nations
“The contractor has submitted the technical specifications and maintenance manual for the Port Harcourt–Aba section to the consultants.
“The ministry is committed to completing this project, which will foster national development,” he said.
The Managing Director of the NRC, Ben Iloanusi, commended the Federal Government and the ministry of transportation for the timely completion and transfer of the project.
Iloanusi, represented by the NRC Deputy Manager (Civil), Adesegun Ogunade, said that the railway had greatly benefited Nigerians seeking affordable transportation options.
“The rail line, now in operation, has started mitigating the impact of high transportation costs caused by economic challenges,” he said.
“Train services have been running for some time and passengers have reported that it has made commuting between Port Harcourt and Aba more convenient, faster and cheaper.
“People are already experiencing the benefits of this government’s policies and programmes.’’
He assured that the Port Harcourt–Maiduguri section would also be completed in due course, emphasising that adequate security arrangements had been made to ensure the safety of workers and passengers.
FG hands over $3bn Port Harcourt-Aba railway project to NRC
-
metro3 days ago
INTERPOL declares 14 Nigerians wanted for drug, human trafficking
-
metro2 days ago
Jigawa State governor loses son 24 hours after mother’s death
-
metro3 days ago
Ibadan stampede: She was treated like a terrorist, Queen Naomi’s sister says about her condition
-
Business3 days ago
NNPCL launches production monitoring centre
-
Business2 days ago
Be creative, monarch, others challenge Muslim professionals on economic revival
-
Entertainment23 hours ago
MultiChoice announces free access to all DSTV channels for 3 days
-
metro17 hours ago
Heavy security in Ilesa as ex-Osun deputy gov emerges new Owa-Obokun
-
Auto19 hours ago
LSM MD extols founder’s qualities after latter posthumous industry award