Nigeria turns to Europe for $1.9bn Kano-Maradi rail funding - Newstrends
Connect with us

Railway

Nigeria turns to Europe for $1.9bn Kano-Maradi rail funding

Published

on

Construction work on $1.9bn Kano-Maradi (Niger Republic) rail line will start on Tuesday (tomorrow) after the inauguration of the project by President Muhammadu Buhari, Minister of Transportation, Rotimi Amaechi, has said.

He also said the bulk of the funds for the project would be sourced from Europe.

Amaechi spoke on a Channels Television programme, Sunday Politics, February 7, 2021.

The project, he said, was one of Nigeria’s strategic attempts to position the country to take advantage of Niger’s landlocked status as it connects Kano to Apapa port in Lagos.

The minister said, “The project is going to cost us $1.9bn and we will source it from mostly Europe.”

The just constructed 156-kilometre Lagos-Ibadan standard gauge railway was funded by a $1.3 billion loan from the Export-Import Bank of China and about $182 million from the Nigerian government. Similarly, China is expected to provide 85 per cent of the $5.3bn for the construction of new Ibadan-Kano railway.

Amaechi, however, noted that the country had not secured the money, stressing that “we are about concluding.”

He had in tweet on Friday said President Buhari would on Tuesday, February 9, 2021, perform the ground-breaking ceremony of the Kano-Maradi, Kano-Dutse railway project.

This is coming after the approval of about $1.9bn by the Federal Executive Council in September 2020, for the rail line and the subsequent signing of the contract documents for the commencement of the project last month.

The minister also on the Channels TV programme spoke on how long it would take the country to repay the loan.

He said, “That is the responsibility of the Ministry of Finance. When we would pay; what are the terms of agreement for the loan and all that would be the responsibility of the Ministry of Finance.

“So, that question can be directed to the Minister for Finance. For us in Transportation, our job is to work with the Ministry of Finance to procure the loan and commence construction and we think we would commence construction on Tuesday.”

He stated that the project would open up the country to more investment, arguing that it was in Nigeria’s best interest for the Kano-Maradi railway to be constructed.

Amaechi said, “The interest is national; the interest is about Nigeria. The Maradi terminal is just 20 kilometres away from Nigeria; just 20 kilometres. So, there is no huge investment like Nigerians are thinking.”

According to the minister, the Lagos-Kano commercial corridor transports 30,000,000 tonnes of cargo annually, with only 200,000 of that currently carried by rail and the rest by road.

The railway project is expected to connect three Nigerian northern states, namely: Kano, Katsina and Jigawa and then terminate at Maradi, Niger Republic.

“We are pleased to announce the groundbreaking of the Kano-Maradi, Kano-Dutse Railway Project, slated for Tuesday, our President, Muhammadu Buhari would do the honours. Work begins,” he stated.

The Federal Government had about three weeks ago, during the signing of the Memorandum of Understanding with Mota-Engil Group, the contractors for the project, disclosed that the Kano-Maradi railway project would be completed within 36 months.

The rail line is expected to help Nigeria compete favourably with other coastal countries of West Africa in servicing the landlocked countries in the area of movement of cargoes and make Lagos ports viable.

 

Loading

Railway

Rail-Port-Industry Link Critical to Cutting Logistics Costs – NRC 

Published

on

Rail-Port-Industry Link Critical to Cutting Logistics Costs – NRC 

 

The Nigerian Railway Corporation has said Nigeria must urgently integrate its rail network with seaports, inland dry ports and industrial centres to cut logistics costs, ease pressure on the highways and make the movement of goods across the country more efficient.

The NRC said a seamless connection between rail lines, ports and major production centres would strengthen the movement of agricultural produce, containers, petroleum products and other bulk cargoes, while reducing the cost and time involved in transporting goods from ports to markets and industries.

The Managing Director/Chief Executive Officer of the NRC, Dr Kayode Opeifa, stated this on Thursday in Lagos in a speech delivered on his behalf at the Transport Correspondents Association of Nigeria conference, stressing that rail, road, maritime, inland waterways and aviation must work as an integrated transportation system if Nigeria is to unlock the full economic benefits of its logistics sector.

The NRC boss also revealed that the corporation had opened the door wider for private investors to participate in the development of freight terminals, logistics hubs, rolling stock and other critical infrastructure as part of efforts to transform Nigeria’s rail system into a major engine of economic growth.

He said stronger private-sector participation was imperative because government alone could not provide the massive investment required to build an efficient and interconnected transportation system capable of lowering logistics costs and boosting economic activities.

Opeifa said Nigeria could no longer afford to develop its transportation modes in isolation, stressing the need to connect rail with seaports, inland dry ports, industrial centres and major economic corridors.

He said such integration would enable rail to play a greater role in moving bulk cargo across the country, while reducing the pressure currently placed on the highways.

According to him, rail has the capacity to move large volumes of passengers and freight over long distances and should therefore become a critical component of Nigeria’s logistics architecture.

He said, “At the Nigerian Railway Corporation, our focus is therefore not only on passenger transportation but also on strengthening freight operations and creating greater connectivity between rail lines, seaports, inland dry ports, industrial centres and major economic corridors.”

The NRC MD identified agricultural produce, petroleum products, containers and other commodities as some of the major categories of cargo that could benefit from a more efficient rail freight system.

He said an effective multimodal transportation network involving rail, road, maritime, inland waterways and aviation would reduce the cost of doing business, improve access to markets and strengthen Nigeria’s competitiveness.

Opeifa also called for a regulatory framework capable of attracting private capital into the transportation sector, particularly in rolling stock, freight terminals, logistics hubs and related infrastructure.

“The future of Nigeria’s transportation sector must also be driven by stronger partnerships. Government alone cannot provide all the infrastructure and investment required,” he said.

The NRC’s position comes amid growing concerns over the high cost of logistics and the burden placed on Nigerian businesses by inefficient movement of goods from ports to markets and production centres.

Opeifa said transportation infrastructure should be viewed not simply as public assets but as critical economic infrastructure capable of stimulating industrial production, trade and employment.

He, however, warned that vandalism and encroachment remained major threats to railway investments, stressing the need for stronger collaboration among government agencies, security organisations, host communities and passengers to protect railway tracks, bridges, signalling systems and other infrastructure.

He said the protection of rail infrastructure must become a collective responsibility if the country was to derive the full economic benefits of ongoing investments in the sector.

The NRC chief executive also stressed the need to make transportation affordable and accessible, noting that improved mobility would provide Nigerians with greater access to jobs, markets, education and economic opportunities.

Opeifa reaffirmed the NRC’s commitment to the Federal Government’s vision of developing a modern, integrated and efficient transportation system capable of supporting the country’s economic aspirations.

He commended TCAN for providing a platform for policymakers, operators, investors, professionals and the media to deliberate on the challenges and opportunities in Nigeria’s transportation sector.

He said sustained investment, innovation, collaboration and effective policy implementation remained essential to building a logistics system capable of unlocking Nigeria’s economic potential.

Loading

Continue Reading

Railway

Fire Scare at Abuja Train Station as Electrical Fault Sparks Blaze, NRC Assures Passengers

Published

on

Fire Scare at Abuja Train Station as Electrical Fault Sparks Blaze, NRC Assures Passengers

Fire Scare at Abuja Train Station as Electrical Fault Sparks Blaze, NRC Assures Passengers

A minor fire caused by an electrical fault broke out at the Idu Train Station in Abuja on Wednesday night, but the incident did not disrupt operations on the Abuja–Kaduna train route, the Nigerian Railway Corporation (NRC) has said.

The fire, which occurred in the station’s low-voltage electrical room, was detected at about 8:30 p.m. and was quickly brought under control by maintenance personnel.

A preliminary inspection showed that some electrical supply cables connected to the station’s control panels were damaged in the incident.

READ ALSO:

However, the NRC said the station’s solar power system was not affected, while power had been temporarily restored to the lifts and escalators.

According to the Corporation’s Chief Public Relations Officer, Callistus Unyimadu, all the lifts and escalators are currently operational except Lift 1.

The NRC stressed that the incident had no impact on Abuja–Kaduna train services, assuring passengers that scheduled operations would continue as normal.

The Corporation said its technical team was conducting a detailed assessment to establish the cause of the electrical fault and permanently restore the affected installations.

It added that appropriate safety measures had been put in place while the assessment and remedial work continued.

 

Fire Scare at Abuja Train Station as Electrical Fault Sparks Blaze, NRC Assures Passengers

Loading

Continue Reading

Railway

Nine Oxygen Cylinders Recovered as NRC, NSCDC Thwart Rail Vandalism in Osogbo

Published

on

Nine Oxygen Cylinders Recovered as NRC, NSCDC Thwart Rail Vandalism in Osogbo

Suspected railway vandals fled for their lives after security operatives swooped on a railway siding serving the Dangote Steel Rolling Mills in Osogbo, Osun State, recovering nine oxygen gas cylinders allegedly deployed for the illegal operation.

The recovery operation, carried out by the Nigerian Railway Corporation (NRC) in collaboration with the Nigeria Security and Civil Defence Corps (NSCDC), followed a report of vandalisation of railway track materials at the siding, currently not in operation.

According to a statement issued by the NRC Chief Public Relations Officer, Callistus Unyimadu, and signed for the management, the Principal Track Officer (PTO), Osogbo, received a report on Friday, August 28, 2026, concerning the ongoing vandalisation of railway track materials at the location.

Following the report, the PTO proceeded to the site with security personnel, including officers of the NSCDC Railway Command. On sighting the operatives, the suspected vandals reportedly fled the scene.

A subsequent search of the area led to the recovery of nine oxygen gas cylinders, which were allegedly being used in the illegal operation.

The recovered railway materials and the surrounding area have since been secured by security personnel, the NRC said.

READ ALSO:

Reacting to the development, NRC Managing Director and Chief Executive Officer, Dr Kayode Opeifa, commended the security personnel for their vigilance and timely intervention, describing the operation as another significant success in the sustained efforts to protect railway infrastructure from vandals and economic saboteurs.

Opeifa directed security operatives to intensify surveillance and enforcement at the Dangote Steel Rolling Mills siding and other railway corridors nationwide.

He also urged security formations across the railway network to strengthen collaboration with relevant agencies to prevent the vandalisation and theft of railway assets.

The NRC boss appealed to members of the public, particularly communities located along railway corridors, to promptly report suspicious activities around railway tracks, stations and other railway facilities.

He stressed that railway infrastructure constitutes critical national assets whose protection is essential to the safety of rail operations, sustainability of services and the economic development of the country.

Opeifa further assured that the NRC would continue to provide necessary support to security agencies in the collective effort to stamp out vandalism and other acts capable of undermining railway operations across the country.

The statement said the NRC remains committed to strengthening collaboration with security agencies to safeguard railway infrastructure nationwide.

 

Nine Oxygen Cylinders Recovered as NRC, NSCDC Thwart Rail Vandalism in Osogbo

Loading

Continue Reading

Trending